Project
Proponent: 
Pilbara Energy (Generation) Pty Ltd
Proposal description: 

The Proposal is for the construction and operation of a renewable energy solar generation hub to power Fortescue mining operations in the Pilbara region. It is located approximately 120 km south of Port Hedland and is within the Kariyarra Native Title determination area. 

The Proposal comprises the installation of solar panels and substation with an estimated total capacity of 644 MW and 220 kV transmission line spurs connecting the Proposal to Fortescue’s existing Pilbara Energy Connect (PEC) transmission system. The proposal also includes supporting infrastructure, and linear supporting infrastructure such as roads and corridors for overhead electrical reticulation. The proposal will be located within a development envelope of 1,416.6 ha and will disturb up to 1,108.2 ha of native vegetation. 

Electricity from the proposal will be exported to the Fortescue integrated electricity network by connecting into the PEC North Star Junction substation being constructed as part of the Pilbara Transmission Project. The PEC transmission infrastructure, however, is not a component of this referral

Region: 
Pilbara
Industry sector: 
Power generation
Last updated: 
April 3, 2025
Current Status: 
Seven-day public comment period closed
Seven-day public comment period closed
1. Referral
Comment on this referral: 
Turner River Solar Hub
Comment period: 
Thursday, 27 March, 2025 to Thursday, 3 April, 2025
Referral documentation: 
PDF icon Turner River Solar Hub - s38 referral form.pdf
PDF icon Turner River-Proposal Content Document.pdf
PDF icon Turner river Solar Hub - Letter_EPAS_s38 referral.pdf
PDF icon APP-0027791 - Turner River Solar Hub - ERD_Redacted_Part1.pdf
PDF icon APP-0027791 - Turner River Solar Hub - ERD_Redacted_Part2.pdf
PDF icon APP-0027791 - Turner River Solar Hub - ERD_Redacted_Part3.pdf
PDF icon Appendix A -Detailed Flora and Veg Assessment Turner River Consolidated.pdf
PDF icon Appendix B -Vertebrate Fauna Assessment North Star Junction.pdf
PDF icon Appendix C - North Star Junction West Detailed Terrestrial Vertebrate Fauna Assessment.pdf
PDF icon Appendix D - Wodgina Project Targeted Bilby Survey.pdf
PDF icon Appendix E - Baseline Surface Water Assessment North Star Junction West Solar Farm.pdf
PDF icon Appendix G - Turner River Solar Hub- Visual Impact Assessment.pdf
PDF icon Appendix G - Visual Impact Assessment Turner River Solar Hub.pdf
PDF icon Appendix H - Turner River Solar Hub Project Noise Assessment.pdf

Source URL:https://www.epa.wa.gov.au/proposals/turner-river-solar-hub