Wagerup Alumina Refinery - Increase in Production to 4.7 Mtpa; and Wagerup Cogeneration Plant

Project
Proponent: 
Alcoa World Alumina Australia
Proposal description: 

Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit.

The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency.

As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the Refinery’s current EP Act Part V licence is 2.5 Mtpa.

Assessment Number: 
1527
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
October 15, 2018
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Environmental Review and Management Programme (ERMP)
Preliminary Environmental Factors: 
Terrestrial Environmental Quality
Hydrological Processes
Date published: 
Monday, 26 July, 2004
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Wagerup Refinery Unit 3 - Environmental Scoping Document - 9 March 2005.pdf
Approved: 
Wednesday, 9 March, 2005
Environmental Review
Public submissions: 
Monday, 16 May, 2005 to Wednesday, 27 July, 2005
Environmental Review documentation: 
PDF icon Environmental Review and Management Programme document
PDF icon Appendix A Water supply report
PDF icon Appendix B Open Space Forum report
PDF icon Appendix C Working Group Terms of Reference
PDF icon Appendix D Working Group meeting reports
PDF icon Appendix E WagerUpdate 7, February 2007
PDF icon Appendix F Wagerup Refinery Health Risk Assessment
PDF icon Appendix G Air Quality Summary Report
Package icon Appendix G Air Quality appendices
PDF icon Appendix H Model Development Report
PDF icon Appendix I Noise Management Strategy
PDF icon Appendix J Wagerup Noise peer review report
PDF icon Appendix K 4db noise reduction report
PDF icon Appendix L Expert Review air modelling studies Phase 1, 2 and 3A - covering letter Katestone Environmental
PDF icon Appendix L - Desktop review of air modelling studies Phase 1, 2 and 3A
PDF icon Appendix L Expert Review air modelling studies Phase 2, 3A and 3B - covering letter Katestone Environmental
PDF icon Appendix L - Desktop review of air modelling studies Phase 2, 3A and 3B
PDF icon Appendix L - Desktop Review of Air Dispersion Modelling of Diffuse Area Source Emissions For The Wagerup Refinery Expansion
PDF icon Appendix M Health Risk Assessment Review
PDF icon Appendix N Oxides of Nitrogen and Particulate Monitoring at Wagerup Refinery
PDF icon Appendix O Baseline radiation parameters prior to W3 expansion
PDF icon Appendix P ERMP Social and Economic Component
PDF icon Appendix Q - Public Safety Risk Assessment
Proponent response to submissions: 
PDF icon Response to Submissions
PDF icon Addendum to the response to submissions
4. EPA Report on assessment
EPA Report Number: 
1215
EPA Report: 
PDF icon Wagerup Alumina Refinery - Increase in Production
Key Environmental Factors: 
Social Surroundings
Land
Date published: 
Thursday, 5 January, 2006
Appeals close: 
Thursday, 19 January, 2006
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Ministerial Statement 728 dated 14 September 2006 as amended by Ministerial Statement 897 dated 9 May 2012.

Date of approval: 
Thursday, 14 September, 2006
Ministerial Statement: 
PDF icon Ministerial Statement 728
Post-assessment changes
Comments: 

These Interim Implementation Conditions are to be read in conjunction with Statement 728 and are to have effect until a further statement is published under section 45(5) as applied by section 46(8) of the Environmental Protection Act 1986. All other conditions of Statement 728 continue to have effect.

Date of approval (46a): 
Tuesday, 27 September, 2016
Section 46 inquiry: 
Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (728 a

Source URL:https://www.epa.wa.gov.au/proposals/wagerup-alumina-refinery-increase-production-47-mtpa-and-wagerup-cogeneration-plant