EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > East Hamersley Railway Project

East Hamersley Railway Project

Project
Proponent: 
The Pilbara Infrastructure Pty Ltd
Proposal description: 

The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting infrastructure.  

The proposal has a development envelope of 31,507 hectare (ha) and a disturbance footprint of 4,837 ha.  

The proposed railway connects the proposed Nyidinghu Iron Ore Mine to the existing Fortescue railway line 14 km north-west of the Cloudbreak mine, crossing Weeli Wolli Creek and the Fortescue Marsh.  

The proposal includes transport, electricity, and water pipeline infrastructure between the Nyidinghu Iron Ore Mine proposal to connect to existing operations.  

The Nyidinghu Iron Ore Mine has also been referred to the Environmental Protection Authority and is being considered concurrently to this proposal. Further information on the Nyidinghu Iron Ore Mine is available here

Proposal Content Document: 
PDF icon Proposal Content Document - March 2025.pdf
Assessment Number: 
2375
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
March 27, 2025
Current Status: 
Environmental Scoping Document approved
Environmental Scoping Document approved
1. Referral
Comment on this referral: 
East Hamersley Railway Project
Comment period: 
Monday, 21 August, 2023 to Sunday, 27 August, 2023
Referral documentation: 
PDF icon Referral form
PDF icon Proposal content document
PDF icon Supporting document
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon East Hamersley Railway Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Landforms
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters
Date published: 
Tuesday, 26 September, 2023
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Final ESD – Approved 130224
Approved: 
Tuesday, 13 February, 2024
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon s. 43A Notice - 270325.pdf
Date of approval s. 43A: 
Thu, 27/03/2025

Source URL:https://www.epa.wa.gov.au/proposals/east-hamersley-railway-project