EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Port Hedland Spoilbank Marina

Port Hedland Spoilbank Marina

Project
Proponent: 
Department of Transport
Proposal description: 

The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA.

The Proposal includes:

  • marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel
  • capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used onsite as fill material to raise the finished ground level prior to landscaping, with excess material disposed offsite
  • construction of the marina’s breakwaters and revetments
  • parking facilities, amenities (public and pen holders), public open space and upgrading of road infrastructure.

The Proposal involves clearing and ground disturbance of up to 40 hectares within a development envelope of approximately 77 hectares. The Proposal includes the ongoing management and maintenance of the marina water body and infrastructure.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Aquaculture
Last updated: 
April 20, 2020
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Port Hedland Spoilbank Marina
Comment period: 
Monday, 9 March, 2020 to Sunday, 15 March, 2020
Referral documentation: 
PDF icon Referral Form
PDF icon Appendix A PHSM Construction Environmental Management Plan
PDF icon Appendix B PHSM Dredge Environmental Management Plan
PDF icon Appendix C PHSM Dust Management Plan
PDF icon Appendix D PHSM Operational Environmental Management Plan
PDF icon Appendix E PHSM Artificial Lighting Impact Assessment
PDF icon Appendix F PHSM Marine Environmental Quality Plan
PDF icon Appendix G PHSM Flora and Vegetation Reconnaissance Survey Report
PDF icon Appendix H PHSM EPBC Protected Matters Search Report
PDF icon Appendix I PHSM Technical Memo Green Sawfish
PDF icon Appendix J PHSM Technical Memo Migratory Birds
PDF icon Appendix K PHSM Underwater Noise Modelling Report
PDF icon Appendix L - PHSM Flatback Turtles Impact Review
PDF icon Appendix M PHSM Sawfish Risk Assessment Workshop Report
PDF icon Appendix N PHSM Sediment Sampling and Analysis Report
PDF icon Appendix O PHSM Water Quality Monitoring Report
PDF icon Appendix P PHSM Benthic Communities and Habitat Report
PDF icon Appendix Q PHSM Benthic Communities and Habitat Cumulative Loss Assessment
PDF icon Appendix R PHSM Coastal Process Studies
PDF icon PHSM Dredging Environmental Management Framework
PDF icon Port Hedland Spoilbank Marina Referral Supporting Information Document
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)
Extract of determination: 
PDF icon Port Hedland Spoilbank Marina
Preliminary Environmental Factors: 
Social Surroundings
Benthic Communities and Habitats
Marine Environmental Quality
Marine Fauna
Public advice: 
PDF icon CMS17779-Advice-200420
Date published: 
Monday, 20 April, 2020

Source URL:https://www.epa.wa.gov.au/proposals/port-hedland-spoilbank-marina