EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Yilgarn Operations - Windarling Range, Mt Jackson Range and Deception Deposit (s. 46)

Yilgarn Operations - Windarling Range, Mt Jackson Range and Deception Deposit (s. 46)

Project
Proponent: 
Cliffs Asia Pacific Iron Ore Pty Ltd
Proposal description: 

The proponent, Cliffs Asia Pacific Iron Ore Pty Ltd (Cliffs), owns and operates iron ore mines at the Windarling Range, the Mt Jackson Range and the Deception Deposit (collectively known as the "Yilgarn Operations") within the Shire of Yilgarn and Shire of Menzies. The Yilgarn Operations are authorised under seven Ministerial Statements issued between 2003 and 2012 by the Western Australian Minister for Environment under section 45(5) of the EP Act. These are:

  • Ministerial Statement 627 (June 2003) for the Koolyanobbing Iron Ore Expansion, including the Windarling Range Deposits (W1, W2, W3/5, and W4 West); the Mt Jackson Deposits (J2 and J3); and the haul road to Cliffs’ Koolyanobbing Range mine operations;
  • Ministerial Statement 802 (August 2009) for the Windarling Range W2 Deposit mining below the groundwater table;
  • Ministerial Statement 843 (October 2010) for the Mt Jackson J1 Deposit;
  • Ministerial Statement 874 (September 2011) to delete condition 7 (related to the W1 deposit) from Statement 627 and insert condition 22 relating to Environmental Offsets;  
  • Ministerial Statement 900 (June 2012) for the Deception Deposit;
  • Ministerial Statement 907 (August 2012) for the Windarling Range W3/5 Deposit mining below the groundwater water table; and
  • Ministerial Statement 909 (October 2012) for the Windarling Range W4 East Deposit.

These Ministerial Statements have undergone numerous post-assessment changes under section 45C (changes to proposal) and section 46 (changes to conditions) of the EP Act.

In May 2013 Cliffs wrote to the Minister for Environment requesting a consolidation of conditions across all its Ministerial Statements for the Yilgarn Operations. This Inquiry is the assessment and recommendations to the Minister for Environment on whether it is appropriate to consolidate the existing seven Ministerial Statements for Cliffs Yilgarn Operations by replacing Ministerial Statements 627, 802, 843, 847, 900, 907 and 909 with a new Ministerial Statement containing a contemporary condition set which addresses the key environmental factors of the original Statements.

Assessment Number: 
2011
Region: 
Goldfields Esperance
Referred under EP Act: 
s46
Industry sector: 
Iron Ore
Last updated: 
December 22, 2021
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
s46 request for a change to environmental conditions (not subject to appeal): Public Notification
Extract of determination: 
PDF icon 2011-ChairDets-090614.pdf
Preliminary Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Date published: 
Monday, 9 June, 2014
4. EPA Report on assessment
EPA Report Number: 
1521
EPA Report: 
PDF icon Yilgarn Operations – Windarling Range, Mt Jackson Range and Deception Deposit – inquiry under s46 of the Environmental Protectio
Date published: 
Thursday, 17 July, 2014
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Summary: Inclusion of the Windarling W7 Pit deposit; Inclusion of Table 4 - Coordinates defining Windarling W7 Pit and Supporting Infrastructure - s45C change approved on 27 November 2015.

Date of approval: 
Wednesday, 24 September, 2014
Ministerial Statement: 
PDF icon Statement 982.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 982 - W1 West pit approval for mining below groundwater table; Inclusion of six hectare Haulage Road Train Parking Area at Windarling; Inclusion of Table 3 - Coordinates defining Haulage Road Train Parking Area at Windarling - s45C change to proposal approved 17 February 2015.

Attachment 2 to Statement 982 - Inclusion of the Windarling W7 Pit Deposit; Inclusion of Table 4 - Coordinates defining Windarling W7 Pit and Supporting Infrastructure - s45C change to proposal approved 27 November 2015.

Attachment 3 to Statement 982 - Inclusion of the Windarling W10 Pit deposit with an additional 24 hectares of disturbance; minor update to Table 4 – Coordinates defining Windarling W7 Pit and Supporting Infrastructure; inclusion of Table 5 - Coordinates defining Windarling W10 Pit and Supporting Infrastructure - s45C change to proposal approved 29 September 2016.

Attachment 4 to Statement 982 - Inclusion of the Altair Pit with an additional 8 hectares of disturbance. Amend the Waste Rock Landform at Deception Deposit - s45C change to proposal approved 26 October 2020.

Attachment 5 to Statement 982 - Altair Pit to be mined below groundwater table - s45C change to proposal approved 22 December 2021.

Date of approval s. 45C: 
Tuesday, 17 February, 2015
Friday, 27 November, 2015
Thursday, 29 September, 2016
Monday, 26 October, 2020
Wednesday, 22 December, 2021

Source URL:https://www.epa.wa.gov.au/proposals/yilgarn-operations-windarling-range-mt-jackson-range-and-deception-deposit-s-46