The proposal involves the construction and operation of a 40 Megawatt power plant fueled by up to 380,000 tonnes (+/-10%) per annum of Eucalyptus globulus (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station.
Inquiry under s46 in response to a request for extension of timeframe for substantial commencement, condition 3 of Ministerial Statement 791.