EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Perth Seawater Desalination Plant 2

Perth Seawater Desalination Plant 2

Project
Proponent: 
Water Corporation
Proposal description: 

The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply.

The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base.

PSDP2 will be developed in two stages (each with a capacity to supply 25 GL) and will be operated independently of the existing PSDP1. The Proposal requires the installation of a seawater intake pipeline and seawater return outlet to enable the discharge of return seawater (brine) to the marine environment.

Assessment Number: 
2227
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
November 25, 2019
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Perth Seawater Desalination Plant 2
Comment period: 
Tuesday, 14 May, 2019 to Monday, 20 May, 2019
Referral documentation: 
PDF icon Referral Form
PDF icon Environmental Review Document - Part A
PDF icon Environmental Review Document - Part B
PDF icon 4. App A_Sediment Plume Dispersion Modelling.pdf
PDF icon 5. App B_Spring 2016 Flora and Fauna Survey.PDF
PDF icon 6. App C_ Aboriginal Heritage Survey.pdf
PDF icon App D_Marine Model Validation Report - Part1.pdf
PDF icon App D_Marine Model Validation Report - Part2.pdf
PDF icon App D_Marine Model Validation Report - Part3.pdf
PDF icon App D_Marine Model Validation Report - Part4.pdf
PDF icon App D_Marine Model Validation Report - Part5.pdf
PDF icon App E_Marine Scenario Report Part 1.pdf
PDF icon App E_Marine Scenario Report_Part2.pdf
PDF icon App E_Marine Scenario Report_Part3.pdf
PDF icon App E_Marine Scenario Report_Part4.pdf
PDF icon 9.App F_Dissolved Oxygen Modelling Summary.pdf
PDF icon 10.App G_Dredging Plume Modelling.pdf
PDF icon 11.App H_PSDP2 Peer Review Panel Final Report .pdf
Package icon 12.App I_LEPA Coordinates.zip
PDF icon 13.App J_Protected Matters Search Tool.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Perth Seawater Desalination Plant 2
Preliminary Environmental Factors: 
Benthic Communities and Habitats
Coastal Processes
Marine Environmental Quality
Marine Fauna
Flora and Vegetation
Date published: 
Monday, 25 November, 2019
3. Assessment
Request for further information
Date: 
Wednesday, 8 January, 2020

Source URL:https://www.epa.wa.gov.au/proposals/perth-seawater-desalination-plant-2