EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Myalup-Wellington Dam Project – Stage 1 (Works above the Wellington Dam)

Myalup-Wellington Dam Project – Stage 1 (Works above the Wellington Dam)

Project
Proponent: 
Collie Water
Proposal description: 

The proposal aims to reduce the flow of high salinity river water entering Wellington Dam and improve the quality of dam water for irrigated agriculture in the Collie and Myalup irrigation districts.

The proposal is to construct a weir, pump stations and pipeline infrastructure and take saline water from the Collie River East Branch of the Upper Collie River, construct and operate a reverse osmosis Water Treatment Plant and supply desalinated water to the Water Corporation via Harris River Dam.

Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
October 7, 2019
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Myalup-Wellington Dam Project – Stage 1 (Works above the Wellington Dam)
Comment period: 
Friday, 3 May, 2019 to Thursday, 9 May, 2019
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Supporting Document.pdf
PDF icon Appendix 1.pdf
PDF icon Appendix 2.pdf
PDF icon Appendix 3.pdf
PDF icon Appendix 4.pdf
PDF icon Appendix 5.pdf
PDF icon Appendix 6.pdf
PDF icon Appendix 7.pdf
PDF icon Appendix 8.pdf
PDF icon Appendix 9.pdf
PDF icon Appendix 10.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)
Extract of determination: 
PDF icon Myalup Wellington Dam Project Stage 1 (Above Dam Works)
Public advice: 
PDF icon CMS17577-Advice-071019.pdf
Date published: 
Monday, 7 October, 2019

Source URL:https://www.epa.wa.gov.au/proposals/myalup-wellington-dam-project-%E2%80%93-stage-1-works-above-wellington-dam