EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Thornlie-Cockburn Link

Thornlie-Cockburn Link

Project
Proponent: 
Public Transport Authority
Proposal description: 

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve.

The proposal requires the construction and operation of two new stations at Ranford and Nicholson Roads in Canning Vale and modification of the existing stations at Thornlie and Cockburn Central. The passenger rail bridge over the Canning River will be duplicated and a principal shared path will be constructed along the new railway.

The proposal would require the clearing of up to 54.9 hectares (ha) of native vegetation, including 22.8 ha in Bush Forever areas. Up to 2.85 ha of Banksia Woodland of the Swan Coastal Plain Threatened Ecological Community, 27.64 ha of black cockatoo foraging habitat and 96 potential black cockatoo habitat trees are proposed to be cleared.

Assessment Number: 
2168
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
June 22, 2023
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Thornlie-Cockburn Link
Comment period: 
Wednesday, 13 June, 2018 to Tuesday, 19 June, 2018
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Supporting Information.pdf
PDF icon Appendix 1 - Network Maps.pdf
PDF icon Appendix 2 - Flora & Fauna Report.pdf
PDF icon Appendix 3 - Thornlie Extension Environmental Assessment - Part 1.pdf
PDF icon Appendix 3 - Thornlie Extension Environmental Assessment - Part 2.pdf
PDF icon Appendix 3 - Thornlie Extension Environmental Assessment - Part 3.pdf
PDF icon Appendix 4 - Preliminary Site Investigation - Part 1
PDF icon Appendix 4 - Preliminary Site Investigation - Part 2
PDF icon Appendix 4 - Preliminary Site Investigation - Part 3
PDF icon Appendix 5 - Sampling and Analysis Plan.pdf
PDF icon Appendix 6 - Noise and Vibration Assessment - Part 1
PDF icon Appendix 6 - Noise and Vibration Assessment - Part 2
PDF icon Appendix 6 - Noise and Vibration Assessment - Part 3
PDF icon Appendix 6 - Noise and Vibration Assessment - Part 4
PDF icon Appendix 6 - Noise and Vibration Assessment - Part 5
PDF icon Appendix 7 - Noise and Vibration Management Plan.pdf
PDF icon Appendix 8 - Aboriginal Heritage Survey.pdf
PDF icon Appendix 9 - Addendum to Aboriginal Heritage Survey
PDF icon Appendix 10 - Section 18 Approval.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Thornlie-Cockburn Link
PDF icon Further explanation of decision on Level of Assessment.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 2 July, 2018
3. Assessment
Request for further information
Date: 
Friday, 27 July, 2018
File upload: 
PDF icon CMS17396 - Request For Further Information - 270718
Environmental Review
Environmental Review documentation: 
PDF icon Appendix 1_Additional_Info_Request.pdf
PDF icon Appendix 2_Existing_Network.pdf
PDF icon Appendix 3_Groundwater_Memo.pdf
PDF icon Appendix 4_Biological_Assessment.pdf
PDF icon Appendix 5_Targeted_sig_flora_survey.pdf
PDF icon Appendix 6_Dieback_Assessment.pdf
PDF icon Appendix 7 - Contam_status_remediation_options.pdf
PDF icon Appendix 8_Auditor Endorsement Letter.pdf
PDF icon Appendix 9 - Noise & Vibration Assessment Part 1.pdf
PDF icon Appendix 9 - Noise & Vibration Assessment Part 2.pdf
PDF icon Appendix 9 - Noise & Vibration Assessment Part 3.pdf
PDF icon Appendix 10 - Noise & Vibration Management Plan
PDF icon Appendix 11_Heritage_Survey.pdf
PDF icon Appendix 12_Heritage_Survey_Addendum.pdf
PDF icon Appendix 13_Section_18_Approval.pdf
PDF icon Appendix 14_Construction_EMP_Part1.pdf
PDF icon Appendix 14_Construction_EMP_Part2.pdf
PDF icon Appendix 15_Offsets_Template_Calculator.pdf
PDF icon Thornlie-Cockburn Link Assessment Information.pdf
PDF icon Thornlie-Cockburn Link Assessment_Figures_Part1.pdf
PDF icon Thornlie-Cockburn Link Assessment_Figures_Part2.pdf
Date Published (Environmental Review documentation): 
May 20, 2019
Proponent response to submissions: 
PDF icon Attachment 1 - TCL_EPA Service comments_PTA Response_FINAL_20190628.PDF
PDF icon Attachment 2 - TCL Public Comments PTA Response_FINAL_20190628.PDF
PDF icon Attachment 3 - TCL_DoEE_Comments_PTA Response_FINAL_20190628 (1).pdf
PDF icon Attachment 4 - TCL - Inland Waters Additional information Report_FINAL_20190627.PDF
PDF icon Attachment 5 - Preliminary Hydrological Assessment_FINAL_20190627.PDF
PDF icon Attachment 6 - Desktop SRE Habitat assessment_FINAL_20190627.PDF
PDF icon Attachment 7 - TCL - Additional info Ranford Road Station_FINAL_20190628.PDF
PDF icon Attachment 8 - Bush Forever Impacts_FINAL_20190628.PDF
PDF icon Attachment 9 - TCL Offsets Additional Information Report FINAL.pdf
PDF icon Attachment 10 - MNES Additional Information letter report_FINAL_20190703.pdf
PDF icon Attachment 11 - Revised Development Envelope_FINAL_20190628.PDF
PDF icon s43A Application TCL - 20190703.pdf
PDF icon s43A Figures Part1.pdf
PDF icon s43A Figures Part2.pdf
Date published (Proponent response to submissions): 
July 26, 2019
Minor or preliminary work under s. 41A(3)
s. 41A(3) notice: 
PDF icon CMS17396 - Consent to Undertake Minor or Preliminary Works - 060319.pdf
PDF icon CMS17396 - Consent to Undertake Minor or Preliminary Works - 210319
Date of approval s. 41A(3): 
Thursday, 21 March, 2019
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon CMS17396 - s43A - Notice of Decision.pdf
Date of approval s. 43A: 
Wed, 19/12/2018
4. EPA Report on assessment
EPA Report Number: 
1646
EPA Report: 
PDF icon EPA Report 1646 - Thornlie-Cockburn Link
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 12 August, 2019
Appeals close: 
Monday, 26 August, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 23 September, 2019
Ministerial Statement: 
PDF icon Statement 1114.pdf
Post-assessment changes
S46C changes to conditions: 

Attachment 1 to Statement 1114 - Minor change to conditions approved under s46C 19 November 2019.

Attachment 2 to Statement 1114 - Minor change to conditions approved under s46C 30 July 2020.

 

Date S46C: 
Tuesday, 19 November, 2019
Thursday, 30 July, 2020
s. 45C amendments: 

Attachment 3 to Statement 1114 - Increase in the development envelope of 4.1 ha and increase in the extent of clearing of native vegetation of 1.0 ha. Change to proposal approved under s45C 9 October 2020.

Attachment 4 to Statement 1114 - Increase in the development envelope of 0.6 ha. Increase in the disturbance footprint of 0.5 ha. Increase in the extent of clearing of native vegetation of 1.5 ha. Change to conditions approved under s45C 21 October 2021.

Attachment 5 to Statement 1114 – Increase in the development envelope and disturbance footprint of 0.4 ha to provide additional areas required to facilitate construction of retaining walls. Change to proposal approved under s45C 4 May 2022

Attachment 6 to Statement 1114 – Increase in the development envelope of 22.1 ha. Increase in the disturbance footprint of 22.1 ha. Increase in the extent of clearing of native vegetation of 3 ha. Change to proposal approved under s45C 22 June 2023.

Attachments: 
PDF icon MS1114 S45C summary of reasons.pdf
Date of approval s. 45C: 
Friday, 9 October, 2020
Thursday, 21 October, 2021
Wednesday, 4 May, 2022
Thursday, 22 June, 2023

Source URL:https://www.epa.wa.gov.au/proposals/thornlie-cockburn-link