EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Barge Site, Laydown Area and Access Road, Gumboot Bay, North Kimberley

Barge Site, Laydown Area and Access Road, Gumboot Bay, North Kimberley

Project
Proponent: 
Striker Resources NL
Proposal description: 

Striker Resources NL proposes to establish a dry door barge site, laydown area, and access road in a coastal inlet 36 kilometres (km) southeast of Cape Londonderry. The site, known locally as Gumboot Bay, is on Unallocated Crown Land that has been identified for inclusion in the Proposed Cape Londonderry National Park (PNP/215). The proposal also includes 3.6 km of unsealed road to be constructed through the PNP/215. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal.

Assessment Number: 
1381
Region: 
Kimberley
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
March 8, 2006
Current Status: 
Minister determined that the proposal should not be implemented
Minister determined that the proposal should not be implemented
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
People
Flora and Vegetation
Date published: 
Monday, 18 June, 2001
3. Assessment
Environmental Review
Public submissions: 
Monday, 13 May, 2002 to Monday, 10 June, 2002
Environmental Review documentation: 
PDF icon A1381_R1172_PER_Appendix A.pdf
PDF icon A1381_R1172_PER_Appendix B.pdf
PDF icon A1381_R1172_PER_Appendix C.pdf
PDF icon A1381_R1172_PER_Appendix D.pdf
PDF icon A1381_R1172_PER_Appendix E.pdf
PDF icon A1381_R1172_PER_Appendix F.pdf
PDF icon A1381_R1172_PER_Appendix G.pdf
PDF icon A1381_R1172_PER_Appendix H.pdf
PDF icon A1381_R1172_PER_Appendix I.pdf
PDF icon A1381_R1172_PER_Figure 1 Location Ashmore Diamond Proj.pdf
PDF icon A1381_R1172_PER_Figure 2 Landuse and Leasing.pdf
PDF icon A1381_R1172_PER_Figure 3 Gumboot Bay Proposed Infrastructure .pdf
PDF icon A1381_R1172_PER_Figure 4 Access Road Vegetation Survey.pdf
PDF icon A1381_R1172_PER_Figure 5 Alternative Landing Sites.pdf
PDF icon A1381_R1172_PER_Master Document.pdf
PDF icon A1381_R1172_PER_Plates.pdf
4. EPA Report on assessment
EPA Report Number: 
1172
EPA Report: 
PDF icon EPA Report 1172
Key Environmental Factors: 
People
Flora and Vegetation
Date published: 
Monday, 23 May, 2005
Appeals close: 
Tuesday, 7 June, 2005

Source URL:https://www.epa.wa.gov.au/proposals/barge-site-laydown-area-and-access-road-gumboot-bay-north-kimberley