EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Yangibana Rare Earths Project

Yangibana Rare Earths Project

Project
Proponent: 
Hastings Technology Metals Limited
Proposal description: 

The proposal is to extract and process Rare Earth Element ore from four mining pits in the Yangibana Project area. The Project area is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne.

The proposal includes mining above and below the ground water table, on-site processing of ore and associated infrastructure. Transport of the product via road to Geraldton port for export is currently proposed.

The proposal would include clearing of up to 1,000 hectares within a development envelope of 12,098 hectares and water abstraction of up to 2.5 gigalitres per year.

Assessment Number: 
2115
Region: 
Gascoyne
Referred under EP Act: 
s38
Industry sector: 
Rare earth elements
Last updated: 
November 9, 2021
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Yangibana Rare Earths Project
Comment period: 
Monday, 13 February, 2017 to Sunday, 19 February, 2017
Referral documentation: 
PDF icon Referral Form
PDF icon Environmental Review Document
PDF icon Flora and Vegetation Report (Appendix 1-1)
PDF icon Flora and Fauna Memo Access Road (Appendix 1-2)
PDF icon GDE Memo (Appendix 1-3)
PDF icon Subterranean Fauna Assessment (Appendix 3-1)
PDF icon Regional Subterranean Fauna Assessment (Appendix 3-2)
PDF icon Hydrogeological Assessment (Appendix 4-2)
PDF icon Radiation Waste Management Plan (Appendix 5-7)
PDF icon Radiation Management Plan (Appendix 5-8)
PDF icon Preliminary Mine Closure Plan (Appendix 6)
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Yangibana Rare Earths Project
Preliminary Environmental Factors: 
Human Health
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 27 February, 2017
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document
Approved: 
Monday, 22 May, 2017
Environmental Review
Public submissions: 
Monday, 1 October, 2018 to Sunday, 28 October, 2018
Make a submission: 
Yangibana Rare Earths Project - Public Environmental Review
Environmental Review documentation: 
PDF icon Yangibana Rare Earths Project - Environmental Review Document
PDF icon Appendix 1-1 Flora and Vegetation Report.pdf
PDF icon Appendix 1-2 Flora and Fauna Memo Access Road.pdf
PDF icon Appendix 1-3 GDE Memo.pdf
PDF icon Appendix 1-4 Flora and Fauna Report (Access Road).pdf
PDF icon Appendix 1-5 Flora and Vegetation EMP.pdf
PDF icon Appendix 2-1 Terrestrial Fauna Report.pdf
PDF icon Appendix 2-2 Ecotoxicity Assessment.pdf
PDF icon Appendix 2-3 Preliminary Fauna Environmental Management Plan.pdf
PDF icon Appendix 3-1 Subterranean Fauna Assessment.pdf
PDF icon Appendix 3-2 Subterranean Fauna Assessment.pdf
PDF icon Appendix 4-1 Conceptual Hydrogeological Assessment.pdf
PDF icon Appendix 4-2 Hydrogeological Assessment 2 - Fractured Rock Aquifers.pdf
PDF icon Appendix 4-3 Surface Water Assessment.pdf
PDF icon Appendix 4-4 Water Management Plan.pdf
PDF icon Appendix 4-5 Hydrogeological Assessment 2 - Paleochannel Tributary.pdf
PDF icon Appendix 5-1 Waste Characterisation Report.pdf
PDF icon Appendix 5-2 Soils Assessment.pdf
PDF icon Appendix 5-3 Preliminary Landform Surface Erodibility Assessment.pdf
PDF icon Appendix 5-4 Baseline Radiation Report.pdf
PDF icon Appendix 5-5 Radiation Waste Characterisation Report.pdf
PDF icon Appendix 5-6 Radiation Impact Assessment.pdf
PDF icon Appendix 5-7 Radiation Waste Management Plan.pdf
PDF icon Appendix 5-8 Radiation Management Plan.pdf
PDF icon Appendix 5-9 Tailings Storage Facility Geotechnical Assessment.pdf
PDF icon Appendix 5-10 Geology - Radionuclides Technical Note.pdf
PDF icon Appendix 5-11 Waste Rock Management Plan.pdf
PDF icon Appendix 5-12 Tailings Leach Study Report.pdf
PDF icon Appendix 6 Mine Closure Plan.pdf
PDF icon Appendix 6-1 Landform Evolution Study.pdf
PDF icon Appendix 6-2 Tailings Storage Facilities Closure - Radiological Design Considerations.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 1.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 2.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 3.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 4.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 5.pdf
PDF icon Appendix 6-3 Tailings Storage Facilities Design Report Part 6.pdf
PDF icon Appendix 7-1 Air Quality Assessment.pdf
PDF icon Appendix 7-2 Memo Radon and Thoron Modelling.pdf
PDF icon Appendix 4-3 Surface Water Assessment Part 4.pdf
Date Published (Environmental Review documentation): 
October 1, 2018
Proponent response to submissions: 
PDF icon Response to Submissions.pdf
PDF icon Appendix 1.pdf
PDF icon Appendix 2.pdf
PDF icon Appendix 3.pdf
PDF icon Appendix 4.pdf
PDF icon Appendix 5.pdf
PDF icon Appendix 6.pdf
PDF icon Appendix 7.pdf
PDF icon Appendix 8.pdf
PDF icon Appendix 9.pdf
PDF icon Appendix 10.pdf
PDF icon Appendix 11.pdf
PDF icon Appendix 12.pdf
PDF icon Appendix 13.pdf
Date published (Proponent response to submissions): 
April 18, 2019
Minor or preliminary work under s. 41A(3)
s. 41A(3) notice: 
PDF icon Notice of decision to consent to minor or preliminary works (s41A(3))
Date of approval s. 41A(3): 
Friday, 25 August, 2017
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon CMS17016 - s43A Notice of Decision - 260618
PDF icon CMS17016 - s43A Notice of Decision - 100519.pdf
Date of approval s. 43A: 
Tue, 26/06/2018
4. EPA Report on assessment
EPA Report Number: 
1642
EPA Report: 
PDF icon Yangibana Rare Earths Project - EPA Report.pdf
Key Environmental Factors: 
Human Health
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Inland Waters
Date published: 
Wednesday, 26 June, 2019
Appeals close: 
Wednesday, 10 July, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 19 August, 2019
Ministerial Statement: 
PDF icon Statement 1110.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1110 - Changes to the location of accommodation village, access road, process plant and aerodrome. Reduction of development envelope by 1,323 ha. Increase the area of clearing by 80 ha. Changes approved under S45c on 9 November 2021.

Date of approval s. 45C: 
Tuesday, 9 November, 2021

Source URL:https://www.epa.wa.gov.au/proposals/yangibana-rare-earths-project