Project
Proponent: 
Coolimba Power Pty Ltd
Proposal description: 

The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of:

  • a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and
  • a 330 kV electricity transmission line to connect the power station to the external electricity network at the proposed Eneabba Substation.
Assessment Number: 
1697
Region: 
Wheatbelt
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Power generation
Last updated: 
September 17, 2010
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon 1697-ChairDets-240907.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Monday, 24 September, 2007
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document (as Appendix A to the PER)
Approved: 
Friday, 3 October, 2008
Environmental Review
Public submissions: 
Monday, 27 April, 2009 to Tuesday, 23 June, 2009
Environmental Review documentation: 
PDF icon PER document
PDF icon Appendix A - Environmental Scoping Document
PDF icon Appendix B - Relevant Legislation, Policies and Guidelines
PDF icon Appendix C - CPP Groundwater Report
PDF icon Appendix D - CPP Preliminary Closure Plan
PDF icon Appendix E - Acid Sulphate Soils Assessment
PDF icon Appendix F - CPP Surface Water
PDF icon Appendix G - Flora and Vege combined
PDF icon Appendix H - Dieback Assessment
PDF icon Appendix I - Vertebrate Fauna Report
PDF icon Appendix J - Compilation of Reports on Carnaby's Cockatoo
PDF icon Appendix K - Stygofauna Surveys
PDF icon Appendix L - Short Range Endemic Surveys
PDF icon Appendix M - Social Impact Assessment
PDF icon Appendix N - Air Quality Assessment
PDF icon Appendix O - Traffic and Transport Report
PDF icon Appendix P - Aboriginal Heritage Survey
PDF icon Appendix Q - CPP Environmental Management Plan
PDF icon Appendix R - Noise Assessment
PDF icon Appendix S - Geochemistry Report
PDF icon Appendix T - Solute Transport - Combined - report
PDF icon Appendix T - Solute Transport - Combined - Figures Part 1
PDF icon Appendix T - Solute Transport - Combined - Figures Part 2
PDF icon Appendix T - Solute Transport - Combined - Figures Part 3
PDF icon Appendix T - Solute Transport - Combined - Figures Part 4
Proponent response to submissions: 
PDF icon Coolimba Power Station Project Response to Submissions
4. EPA Report on assessment
EPA Report Number: 
1350
EPA Report: 
PDF icon Coolimba Power Station Project
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Wednesday, 10 March, 2010
Appeals close: 
Wednesday, 24 March, 2010
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Friday, 17 September, 2010
Ministerial Statement: 
PDF icon Ministerial Statement 838

Source URL:https://www.epa.wa.gov.au/proposals/coolimba-power-station-project-eneabba