EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Marda Gold Project

Marda Gold Project

Project
Proponent: 
Southern Cross Goldfields Limited
Proposal description: 

Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross.

The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock landforms would be located adjacent to the King Brown and Golden Orb pits. Part of Marda Central is also located within a proposed 5(1)(h) Conservation and Mining reserve managed by the Department of Parks and Wildlife.

Region: 
Goldfields Esperance
Referred under EP Act: 
s38
Industry sector: 
Gold
Last updated: 
December 8, 2016
Current Status: 
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Marda Gold Mine
Comment period: 
Monday, 13 January, 2014 to Sunday, 19 January, 2014
Referral documentation: 
PDF icon Referral Form
PDF icon Figures
PDF icon Appendix A - Level 2 Flora and Veg and Targeted Priority Flora Survey
PDF icon Appendix B - Subterranean Fauna Risk Assessment
PDF icon Appendix C-1 - Level 1 Fauna Risk Assessment, Marda
PDF icon Appendix C-2 - Level 1 Fauna Risk Assessment, King Brown
PDF icon Appendix C-3 - Level 1 Fauna Survey, Golden Orb
PDF icon Appendix C-4 - Level 1 Fauna Assessment of Proposed Haul Roads, Camps, Airstrips
PDF icon Appendix C-5 - Targeted Fauna Assessment
PDF icon Appendix C-6 - Tree Hollow Assessment for Cockatoos at Battler, King Brown, Marda and Golden Orb
PDF icon Appendix D-1 - SRE Fauna Desktop and Risk Assessment
PDF icon Appendix D-2 - Level 2 SRE Survey of Marda, Level 1 SRE of Golden Orb and King Brown
PDF icon Appendix D-3 - SRE Desktop and Risk Assessment of Haul Roads and Infrastructure
PDF icon Environmental Referral Supporting Document
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)
Extract of determination: 
PDF icon 14-512340 - CD - 100314.pdf
Public advice: 
PDF icon 14-512340 Marda Gold s39A public advice 100314.pdf
Date published: 
Monday, 10 March, 2014

Source URL:https://www.epa.wa.gov.au/proposals/marda-gold-project