EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > 0594 - Desalinated Water and Seawater Supplies Project, Burrup Peninsula

0594 - Desalinated Water and Seawater Supplies Project, Burrup Peninsula

Information: 

Attachment 1 to Statement 594 - An alternative seawater intake pump station - change to proposal approved under s45C on 5 March 2010.

Attachment 2 to Statement 594 – Construct and operate a six gigalitre per annum reverse osmosis desalination plant to supply industry and domestic customers. – change to proposal approved under s45C on 6 August 2010.

Attachment 3 to Statement 594 – Define the development envelope using spatial coordinates (Replace Figure 2 of MS 594 with defined development envelope in schedule 3 (new)). Increase development envelope by 1.44 ha, from 17.96 to 19.40 ha. Increase in clearing by 0.26 ha, from 6.36 to 6.62 ha. Delete in Table 2 the element Operational Noise, and description: Seawater intake system: “less than 70 dB(A) at 1 metre from pump well”. Change to proposal approved under s45C on 19 April 2024.

Attachment 4 to Statement 594 - Replaces Figure 1 of MS 594 Attachment 3 with amended development envelope and disturbance footprint Figure 1 of MS 594 Attachment 4. Increase development envelope from 19.40 to 19.63 ha. Increase disturbance footprint from 8.23 to 8.65 ha. Change to proposal approved under s45C on 25 August 2025

Ministerial Statement File: 
PDF icon Ministerial Statement 594.pdf
Date of approval: 
June 5, 2002
Go to the full case view of this Proposal: 
Upgrade of multi-user seawater supply and introduction of wastewater to ocean outfall, Burrup Peninsula (s46)

Source URL:https://www.epa.wa.gov.au/0594-desalinated-water-and-seawater-supplies-project-burrup-peninsula