0594 - Desalinated Water and Seawater Supplies Project, Burrup Peninsula

Information: 

Attachment 1 to Statement 594 - An alternative seawater intake pump station - change to proposal approved under s45C on 5 March 2010.

Attachment 2 to Statement 594 – Construct and operate a six gigalitre per annum reverse osmosis desalination plant to supply industry and domestic customers. – change to proposal approved under s45C on 6 August 2010.

Attachment 3 to Statement 594 – Define the development envelope using spatial coordinates (Replace Figure 2 of MS 594 with defined development envelope in schedule 3 (new)). Increase development envelope by 1.44 ha, from 17.96 to 19.40 ha. Increase in clearing by 0.26 ha, from 6.36 to 6.62 ha. Delete in Table 2 the element Operational Noise, and description: Seawater intake system: “less than 70 dB(A) at 1 metre from pump well”. Change to proposal approved under s45C on 19 April 2024.

Ministerial Statement File: 
PDF icon Statement 594.PDF
Date of approval: 
June 5, 2002
Go to the full case view of this Proposal: 
Upgrade of multi-user seawater supply and introduction of wastewater to ocean outfall, Burrup Peninsula (s46)