EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Balannup Wastewater Pressure Main

Balannup Wastewater Pressure Main

Project
Proponent: 
Water Corporation
Proposal description: 

The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale.

Assessment Number: 
2081
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
May 20, 2025
Related EPA Media Statement: 
EPA to formally assess underground pipeline through Bush Forever bushland
EPA recommends approval for underground pipeline: Report 1592
Current Status: 
Ministerial Statement withdrawn under s.47A
1. Referral
Comment on this referral: 
Balannup Wastewater Pressure Main
Comment period: 
Friday, 18 March, 2016 to Thursday, 24 March, 2016
Referral documentation: 
PDF icon Referral form
PDF icon Supporting documentation
PDF icon Supporting documentation - Appendix A
PDF icon Supporting documentation - Appendix B
PDF icon Appendix A
PDF icon Appendices B and C
PDF icon Appendices D-F
PDF icon Appendices I - O
PDF icon Hydrological assessment Appendix G Part 1
PDF icon Hydrological assessment Appendix G Part 2
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Assessment on Proponent Information - Category A
Extract of determination: 
PDF icon 14335 CD May 23 2016.pdf
Preliminary Environmental Factors: 
Flora and Vegetation
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 23 May, 2016
4. EPA Report on assessment
EPA Report Number: 
1592
EPA Report: 
PDF icon Balannup Wastewater Pressure Main
Proponent documents: 
PDF icon Appendix 1 EPA scoping guideline.pdf
PDF icon Appendix 2 ENV 2013 Flora.pdf
PDF icon Appendix 3-1. Referral Supporting Documentation 2014 AECOM.pdf
PDF icon Appendix 3-2.EcoPlough.pdf
PDF icon Appendix 3-3.Route Options Considered.pdf
PDF icon Appendix 3-4. Trenchless Construction Techniques Analysis.pdf
PDF icon Appendix 4 - Groundwater Assessment
PDF icon Appendix 5 - Pressure Main Report on the Geotechnical, Acid Sulfate Soils and Contaminated Sites Investigation - Part 1
PDF icon Appendix 5 - Pressure Main Report on the Geotechnical, Acid Sulfate Soils and Contaminated Sites Investigation - Part 2
PDF icon Appendix 6 - Draft Acid Sulfate Soil and Dewatering Management Plan
PDF icon Appendix 7 GHD 2015 Hydrological Study (Part 1).pdf
PDF icon Appendix 7 GHD 2015 Hydrological Study (Part 2).pdf
PDF icon Appendix 7 GHD 2015 Hydrological Study (Part 3).pdf
PDF icon Environmental Review
Key Environmental Factors: 
Flora and Vegetation
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 23 January, 2017
Appeals close: 
Monday, 6 February, 2017
5. Decision on proposal and implementation of proposal
Withdrawal of Ministerial Statement
Notice of withdrawal of Ministerial Statement: 
PDF icon s. 47A - Withdrawal of Statement - 200525.pdf
Date withdrawn: 
Tuesday, 20 May, 2025
Ministerial Statement
Date of approval: 
Tuesday, 3 October, 2017
Ministerial Statement: 
PDF icon Ministerial Statement 1063.pdf

Source URL:https://www.epa.wa.gov.au/proposals/balannup-wastewater-pressure-main