The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah.