Attachment 1 to Ministerial Statement 1065 - Increase in the development envelope to allow for laydown areas and pipe stringing; and a change in the alignment of the recharge pipeline and development envelope to allow for greater lengths of trenchless construction – change to proposal approved under s45C on 7 May 2018.
Attachment 2 to Ministerial Statement 1065:
Changes:
- modified location and alignment of the pipe being installed using trenchless technology including relocation of the two drill pits at either end of the 'trenchless technology' instalation
- addition of approximately 50 metres of pipe between the new trenchless technology installation and the approved alignment which will be constructed using open trench construction methods; and
- removal from the develpment envelope of approximately 385 metres (m) of pipe installation.
Change to proposal approved under s45C on 4 December 2018.
Date of approval s. 45C