Project Proponent Port Hedland Port Authority Proposal description The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Assessment Number 1987 Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Last updated August 12, 2024 Current Status Ministerial Statement published 1. Referral Comment on this referral Lumsden Point General Cargo Facility, Town of Port Hedland Referral documentation 1987-s38 Proponent Referral Form_ Lumsden Point General Cargo Facility_FINAL.pdf (PDF, 446.67 KB) 1987-Referral-Supporting-Document_FINAL.pdf (PDF, 4.75 MB) 1987-RSD_Appendix 1_Construction and Dredge Management Plan_FINAL.pdf (PDF, 3.43 MB) 1987-RSD_Appendix 2_Sediment Quality Report_FINAL.pdf (PDF, 886.05 KB) 1987-RSD_Appendix 3_Benthic Habitat Survey_FINAL.pdf (PDF, 2.75 MB) 1987-RSD_Appendix 5_Cumulative Impact Assessment_FINAL.pdf (PDF, 3.24 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Assessment on Proponent Information - Category A Extract of determination Chairman's Determination - Lumsden Point General Cargo Facility (PDF, 137.16 KB) Preliminary Environmental Factors Benthic Communities and Habitats Marine Environmental Quality Marine Fauna Date published Monday, November 11, 2013 - 12:00 4. EPA Report on assessment EPA Report Number 1503 EPA Report Report 1503 - Lumsden Point General Cargo Facility (PDF, 3.63 MB) Proponent documents 1987-PHPA-LPGCF-Referral-Supporting-Document.zip (ZIP, 33.93 MB) 1987-PHPA-LPGCF-Response-to-comments.zip (ZIP, 23.7 MB) Key Environmental Factors Benthic Communities and Habitats Marine Environmental Quality Date published Monday, February 10, 2014 - 12:00 Appeals close Monday, February 24, 2014 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Monday, May 12, 2014 - 12:00 Ministerial Statement Ministerial Statement 967.pdf (PDF, 1.48 MB) Post-assessment changes s. 45C amendments Attachment 1 to Statement 967 - Include a 139.46 hectare development envelope for the temporary pipeline corridor; include DMMA B as a location for dewatering discharge; and update Figure 1 and delineation coordinates - change to proposal under s45C approved on 21 July 2017. Attachment 2 to Statement 967 - Changes: increase the dredging area development envelope by 6.9 ha to allow for deepening of the Stingray Creek Southern Swing Basin; dredging volume increase by 400,000 m3 (total volume of 2.4 million m3); and update Figure 1 and delineation coordinates. Change to proposal under s45C approved on 14 April 2020. Attachment 3 to Statement 967 -Changes: • Include an increase to the causeway construction Development Envelope by 0.069 ha to allow for a straight path between DMMA C and the Land Backed Warf Area (total Development Area increase from 195.00 ha to 195.07 ha). • Include an increase to average vertical dredge profile from 0.2 m to 0.5 m for berth pockets, shipping channel and turning basin dredging. • Include onshore placement of remaining dredge material within Dredge Material Management Area C (DMMA C).- change to proposal under s45C approved on 27 September 2023. Date of approval s. 45C Friday, July 21, 2017 - 12:00 Tuesday, April 14, 2020 - 12:00 Wednesday, September 27, 2023 - 12:00