Proposal description

The proposal is to expand the capacity of the existing Dampier salt field from 2.5 million tonnes per annum to 4 million tonnes per annum. Expansion is planned in four stages, depending on market demand, commencing in 1990 through to about 1997.

Expansion would occur within the existing salt field lease boundary which has been operating at Dampier since the late 1960s.

The proposed expansion is based on recovering waste salt from the disused bitterns holding pond then utilising this previously disturbed area for future production.

The expansion would allow the introduction of new technology to extract additional sodium chloride normally lost as waste, thereby increasing the productivity of both the land area presently used and the disused bitterns holding pond.

Assessment Number
423
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Environmental Review
4. EPA Report on assessment
EPA Report Number
448
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email