Heavy minerals mine - Beenup

Project
Proposal description

The proposal is to mine about 50ha of farmland per year, by dredging, to produce 500,000 tonnes of heavy minerals annually, for at least 20 years.

The dredge would float on the natural watertable surface and reach to the bottom of the deposit without the need to raise or lower the water table. Minerals would be separated from the ore in a wet concentrator floating behind the dredge and by dry concentration at a dry mill at the north of the site. Sand and fine tailings would be returned to the dredge pond and subsequently rehabilitated to reestablish both pasture and belts of native vegetation.

Assessment Number
312
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
483
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email