Relocation of Herne Hill quarry operation

Project
Proponent: 
Pioneer Concrete (W.A) Pty Ltd
Proposal description: 

Existing quarry operations (Pioneer No.1) are located on freehold land owned by Pioneer at Lot 11, Neuman Road, Heme Hill in the Shire of Swan. It is proposed to relocate the operation to a new site (Pioneer No.2), within the freehold property, 1.5 kilometres east of the present site in a valley behind the main ridge of the Darling Scarp.

Pioneer No.2 is expected to be operational within three years of the date that all necessary approvals have been obtained. The new site has at least 100 years of resource.

It is intended that, by moving the quarry operation deeper into the Pioneer landholding, impacts on residential areas from dust, noise, and odours will be reduced, for both existing and future residential development. Pioneer proposes to remove all structures and equipment from Pioneer No.1 and to landscape and complete the rehabilitation of the quarry area. Rehabilitation of the Pioneer No.2 site will be carried out progressively and integrated into the quarry operations.

Assessment Number: 
354
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Sand, rock, gravel and clay
Last updated: 
November 19, 2012
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Date published: 
Friday, 26 January, 1990
3. Assessment
Scoping
Approved: 
Tuesday, 6 March, 1990
Environmental Review
Public submissions: 
Saturday, 1 September, 1990 to Saturday, 27 October, 1990
Environmental Review documentation: 
PDF icon PER document
4. EPA Report on assessment
EPA Report Number: 
510
EPA Report: 
PDF icon Relocation of Herne Hill Quarry Operation
Date published: 
Friday, 19 April, 1991
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Thursday, 5 December, 1991
Ministerial Statement: 
PDF icon Ministerial Statement 199
Post-assessment changes
Section 46 inquiry: 
Relocation of Herne Hill Quarry Operation (s46)
s. 45C amendments: 

Attachment 1 to Statement 199- Change to the area of the west pit development - s45C change to proposal approved 25 January 2006.

Attachment 2 to Statement 199 - Change to the west pit - s45C change to proposal approved 22 September 2006.

Attachment 3 to Statement 199 - Clearing of 1 ha of vegetation for the purpose of extending the stockpile and conyeyor areas - s45C change to proposal approved 19 November 2012.

Date of approval s. 45C: 
Wednesday, 25 January, 2006
Friday, 22 September, 2006
Monday, 19 November, 2012