EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Contamination Management Strategy for East Perth Gasworks Site and adjacent areas of the swan river

Contamination Management Strategy for East Perth Gasworks Site and adjacent areas of the swan river

Project
Proponent: 
State Energy Commission of Western Australia
Proposal description: 

The former Gasworks site at East Perth was used for the production of gas from coal between 1922 and 1971. Since decommissioning of the gas plant in 1971, structures have been progressively demolished. The site is now used as a services depot by the State Energy Commission of Western Australia, which is the owner of the site. As a result of past operations, extensive contamination by coal tars, including known carcinogenic and toxic organic chemicals, exists on the site and in adjacent areas of the Swan River and the Claisebrook Drain. The site is regarded as a seriously contaminated industrial site.

In a separate proposal to this assessment, the East Perth Redevelopment Authority proposes to construct an artificial waterway called the Claisebrook Inlet. The waterway would be a focal point of the town centre for the redeveloped East Perth area, and would provide an aesthetic amenity and direct connection with the Swan River. The waterway would be located at the existing outlet of the Claisebrook Drain, which enters the Swan River adjacent to the southern boundary of the Gasworks site. Construction of the inlet and access channel would involve excavating material from the Claisebrook Drain and the Swan River, parts of which would include contaminated sediments. Movement of contaminants from the Gasworks site could have major deleterious effects, particularly in combination with the East Perth Redevelopment Authority's Inlet proposal. The proposed Claisebrook Inlet and the redevelopment of the East Perth area are therefore constrained by the necessity to properly manage the contamination within and around the Gasworks site.

This referral is the SECWA's proposed contamination management strategy for the Gasworks site and adjacent areas. The key environmental issues identified are:

 

Assessment Number: 
636
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Industrial
Last updated: 
March 8, 1994
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
Social Surroundings
Human Health
Date published: 
Saturday, 3 August, 1991
3. Assessment
Scoping
Approved: 
Tuesday, 31 December, 1991
Environmental Review
Public submissions: 
Friday, 27 March, 1992 to Monday, 25 May, 1992
Environmental Review documentation: 
PDF icon PER document
4. EPA Report on assessment
EPA Report Number: 
651
EPA Report: 
PDF icon Contamination management strategy for East Perth gasworks site and adjacent areas of the Swan River
Key Environmental Factors: 
Human Health
Date published: 
Friday, 9 October, 1992
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 8 March, 1994
Ministerial Statement: 
PDF icon Ministerial Statement 346

Source URL:https://www.epa.wa.gov.au/proposals/contamination-management-strategy-east-perth-gasworks-site-and-adjacent-areas-swan-river