Inquiry under s46 regarding a proposal to increase the generating capacity of the Pinjar station by a nominal 340MW. This increased capacity would be provided through the installation of:
- a fourth Frame 9 (nominally llOMW) gas turbine, together with;
- four waste heat boilers and two 115MW steam turbines with associated infrastructure.
This proposal will increase the total potential generating capacity of the Pinjar station from a nominal 575MW (7 times 37MW plus 3 times 105MW) to 915MW (575MW plus 340MW).