EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Staged expansion of Tiwest Pigment Plant to 180,000 tpa, Kwinana

Staged expansion of Tiwest Pigment Plant to 180,000 tpa, Kwinana

Project
Proponent: 
Tiwest Joint Venture Pty Ltd
Proposal description: 

The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages:

  1. Stage I: increase to 120,000 tpa,
  2. Stage 2: increase to 165,000 tpa and
  3. Stage 3: increase to nominally 180,000 tpa.

The first and second stages of the expansion wilI require major modifications to the plant (plant infrastructure to achieve 180,000 tpa capacity will be developed during Stage 1 construction and approximately 85% of the mechanical process equipment will be installed in Stage 1). Stage 3 expansion will depend upon technological and commercial viabilities and will require minor modifications.

Assessment Number: 
1039
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Industrial
Last updated: 
June 30, 1997
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Consultative Environmental Review
Preliminary Environmental Factors: 
Marine Environmental Quality
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Friday, 16 August, 1996
3. Assessment
Scoping
Approved: 
Friday, 27 September, 1996
Environmental Review
Public submissions: 
Monday, 7 October, 1996 to Monday, 4 November, 1996
Environmental Review documentation: 
PDF icon Consultative Environmental Review document
4. EPA Report on assessment
EPA Report Number: 
847
EPA Report: 
PDF icon Staged expansion of Tiwest Pigment Plant to 180,000 tpa, Kwinana
Key Environmental Factors: 
Hydrological Processes
Date published: 
Tuesday, 1 April, 1997
Appeals close: 
Tuesday, 15 April, 1997
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 30 June, 1997
Ministerial Statement: 
PDF icon Ministerial Statement 452

Source URL:https://www.epa.wa.gov.au/proposals/staged-expansion-tiwest-pigment-plant-180000-tpa-kwinana