EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Voyager Quarry Avon Loc 1881, Lots 11 and 14 Horton Rd, The Lakes

Voyager Quarry Avon Loc 1881, Lots 11 and 14 Horton Rd, The Lakes

Project
Proponent: 
BGC (Australia) Pty Ltd
Proposal description: 

The proposal is for the extension of an existing quarry at The Lakes, approximately 16 kilometres east of Mundaring and 47 kilometres south-west of Northam on the Great Southern Highway. The proponent has been operating the existing quarry since 1990. The quarry provides crushed granite for a variety of uses, including concrete, road base and building products. The current quarry comprises an open pit, a crushing plant, noise attenuation bunds, product stockpiles, a water supply dam, a workshop, fuel storage facilities, office facilities, amenities and a weighbridge. The operation has a nominal rated throughput of approximately 900,000 tonnes per annum (tpa).

Assessment Number: 
1413
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Sand, rock, gravel and clay
Last updated: 
May 20, 2015
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Date published: 
Monday, 24 December, 2001
3. Assessment
Environmental Review
Environmental Review documentation: 
PDF icon PER Volume 1 - Executive summary
PDF icon PER Volume 2 - Report
PDF icon PER Volume 3 - Appendices
PDF icon Dust Monitoring & Remedial Action Plan
PDF icon Fauna Relocation and Habitat Plan
PDF icon Groundwater Monitoring and Remedial Programme
PDF icon Interim Trap-door Spider Management Plan for Stages 1 and 2
PDF icon Operational Noise Measurement Programme
PDF icon Surface Water Monitoring and Remedial Programme
PDF icon Area Specific Noise Management Plan Areas 1 and 2
PDF icon Area Specific Noise Management Plan Areas 3 and 4
PDF icon Area Specific Noise Management Plan
PDF icon Blast and Vibration Management Plan
PDF icon Closure and Rehabilitation Strategy
Proponent response to submissions: 
PDF icon Voyager Quarry- Response to Submissions Volume 1
PDF icon Voyager Quarry- Response to Submissions Volume 2
4. EPA Report on assessment
EPA Report Number: 
1169
EPA Report: 
PDF icon Land Clearing and Quarry Extension, Avon Loc 1881, Lots 11 14 Horton Rd, The Lakes
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Terrestrial Fauna
Hydrological Processes
Date published: 
Tuesday, 26 April, 2005
Appeals close: 
Tuesday, 10 May, 2005
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Friday, 16 December, 2005
Ministerial Statement: 
PDF icon Ministerial Statement 706
Post-assessment changes
S46C changes to conditions: 

Attachment 1 to Statement 706 - Change to condition 7-1. Minor change to implementation conditions made under s46C approved on 20 May 2015.

Date S46C: 
Wednesday, 20 May, 2015
Section 46 inquiry: 
Voyager Quarry, Lots 11 and 14 Horton Road, The Lakes, Avon Location 1881, Shire of Northam (s46) [1863]
Voyager Quarry, Lots 11 & 14 Horton Road, The Lakes, Avon Location 1881, Shire of Northam (s46) [1931]
s. 45C amendments: 

Attachment 2 to Statement 706 - Increase in the disturbance footprint by 6.5 hectares; removal of ‘Quarry Operating Hours’; removal of elements that are not key proposal characteristics, or managed under other legislation. Change to proposal made under s45C approved on 27 May 2015.

Date of approval s. 45C: 
Wednesday, 27 May, 2015

Source URL:https://www.epa.wa.gov.au/proposals/voyager-quarry-avon-loc-1881-lots-11-and-14-horton-rd-lakes