Bluewaters Power Station Phase I

Project
Proponent: 
Griffin Energy Pty Ltd
Proposal description: 

Griffin Energy Pty Ltd, proposes to construct and operate the 200MW Bluewaters Power Station on a site located approximately 4km north-east of Collie. It will be a subcritical coal fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters Power Station will supply electricity to customers in the proposed Coolangatta Industrial Estate, or via the South West Interconnected System (SWIS).

Assessment Number: 
1487
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Power generation
Last updated: 
April 4, 2018
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Date published: 
Monday, 8 September, 2003
4. EPA Report on assessment
EPA Report Number: 
1160
EPA Report: 
PDF icon Bluewaters Power Station
Key Environmental Factors: 
Social Surroundings
Water
Hydrological Processes
Date published: 
Tuesday, 18 January, 2005
Appeals close: 
Tuesday, 1 February, 2005
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 24 August, 2005
Ministerial Statement: 
PDF icon Ministerial Statement 685
Post-assessment changes
Comments: 

Attachment 8 to Statement 685 – Change to condition 1 Metal Emissions Monitoring – interim implementation conditions approved under section 46A on 21 December 2015.

Date of approval (46a): 
Monday, 21 December, 2015
s. 45C amendments: 

Attachment 1 to Statement 685 – Modification of the location plan and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 28 March 2006.

Attachment 2 to Statement 685 – Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the construction laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.

Attachment 3 to Statement 685 – change to ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.

Attachment 4 to Statement 685– Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.

Attachment 5 to Statement 685 – Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.

Attachment 6 to Statement 685 – Increase the power generating capacity from 208 megawatts to 217 megawatts - s45C change to proposal approved on 23 October 2009.

Attachment 7 to Statement 685 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.

Attachment 9 to Statement 685 - Adjustment of annual pollutant loads emitted to air - change to proposal approved under S45c on 4 April 2020.

Date of approval s. 45C: 
Tuesday, 28 March, 2006
Tuesday, 18 September, 2007
Tuesday, 12 August, 2008
Friday, 7 November, 2008
Wednesday, 2 September, 2009
Friday, 23 October, 2009
Monday, 7 January, 2013
Thursday, 5 April, 2018

Source URL:https://www.epa.wa.gov.au/proposals/bluewaters-power-station-phase-i