The construction of a gas pipeline to supply natural gas for on-site power generation at Nifty Copper Operations located in the eastern Pilbara region. The gas pipeline is a 46 kilometre spur line from the Port Hedland - Telfer Pipeline to Nifty Copper Operations. Inquiry under s46 to change implementation conditions of Ministerial Statement 676.