EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Chichester Rail Deviation

Chichester Rail Deviation

Project
Proponent: 
BHP Billiton Iron Ore Pty Ltd
Proposal description: 

BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access tracks, and borrow pits.

Assessment Number: 
1801
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
December 4, 2009
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon Referral document
PDF icon Fast scan to a B&W PDF file.PDF
PDF icon Appendix A Surface Water Management Plan Rev A.pdf
PDF icon Appendix B Significant Species Management Plan Rev A.pdf
PDF icon Appendix C Weed Management Plan Rev A.pdf
PDF icon Appendix D Construction EMP.pdf
PDF icon Appendix E Surface Water Assessment.pdf
PDF icon Appendix F Vegetation and Flora Assessment.pdf
PDF icon Appendix G Fauna Assessment.pdf
PDF icon Appendix H Short Range Endemic Invertebrate and Aurecocrypta.pdf
PDF icon Appendix I Aurecocrypta sp. Report (Dr R Raven).pdf
PDF icon Appendix J Vibration Impact Assessment.pdf
PDF icon Appendix K Noise Impact Assessment.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Referral Information
Date published: 
Monday, 30 March, 2009
4. EPA Report on assessment
EPA Report Number: 
1336
EPA Report: 
PDF icon EPA Report 1336.PDF
Key Environmental Factors: 
Flora and Vegetation
Date published: 
Monday, 31 August, 2009
Appeals close: 
Monday, 14 September, 2009
5. Decision on proposal and implementation of proposal
Ministerial Statement
Ministerial Statement: 
PDF icon Statement 818.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 818 - Increased groundwater requirements and revised culvert numbers and
locations. Change to conditions approved under s. 45C on 13 April 2010

Date of approval s. 45C: 
Tuesday, 13 April, 2010

Source URL:https://www.epa.wa.gov.au/proposals/chichester-rail-deviation