Proposal description: 

The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide additional capacity to connect largescale renewable energy generation and meet future demand. The Proposal involves the following components: 

  • Construction of steel lattice towers, steel poles or hybrid of both options. For the purposes of this referral, it is assumed steel lattice towers will be used. 

  • Installation of 330kV overhead conductors, grounding wires and communications wires. 

  • Construction of a 4-m wide permanent maintenance access track centred on the line route. 

  • Establishment of a 60 m-wide vegetation clearance zone (ie, 30 m either side of the line route). Maximum vegetation height in this zone will be limited to 3 m.

In addition, the Proposal includes the following temporary construction activities: 

  • Construction access track. 

  • Break and winch sites every 6 km of line for stringing conductors. 

  • Clearing within a 20m wide corridor where necessary for turnaround areas, laydown/storage areas, laying of conductors and other construction activities.

Assessment Number: 
2410
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
July 22, 2024
Current Status: 
Assessment on Proponent Information – Request for More Information published
1. Referral
Comment on this referral: 
Northern Terminal to Neerabup Terminal 330kV Transmission Line
Comment period: 
Thursday, 29 February, 2024 to Thursday, 7 March, 2024
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Att 1 - Proposal Content Document.pdf
PDF icon Att 2 - Development Envelope Figures.pdf
PDF icon Att 3 - AECOM 2024 - Environmental Impact Assessment - Rev 1 - reduced.pdf
PDF icon Att 4 - Tenure Summary.pdf
PDF icon Att 5 - NT-NBT 330kV Line - FVF Assessment Rev0 - Reduced_Part1.pdf
PDF icon Att 5 - NT-NBT 330kV Line - FVF Assessment Rev0 - Reduced_Part2.pdf
PDF icon Att 6 - Summary of impact on Banksia Woodlands TEC patches.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Northern Terminal to Neerabup Terminal 330kV Transmission Line
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 25 March, 2024
3. Assessment
Request for further information
Date: 
Monday, 22 July, 2024
File upload: 
PDF icon Request for further information - Northern Terminal to Neerabup Terminal 330kV Transmission Line.pdf
PDF icon Attachment A - DCCEEW comments on adequacy of referral information and further information required for assessment.pdf

Source URL:https://www.epa.wa.gov.au/proposals/northern-terminal-neerabup-terminal-330kv-transmission-line