Cooljarloo Mine – Falcon Extension

Project
Proponent: 
Tiwest Pty Ltd
Proposal description: 

The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities.

Assessment Number: 
1749
Region: 
Wheatbelt
Referred under EP Act: 
s38
Industry sector: 
Mineral sands
Last updated: 
March 16, 2009
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Environmental Protection Statement (EPS)
Extract of determination: 
PDF icon 1749-ChairDets-180208.pdf
Preliminary Environmental Factors: 
Flora and Vegetation
Hydrological Processes
Date published: 
Monday, 18 February, 2008
4. EPA Report on assessment
EPA Report Number: 
1299
EPA Report: 
PDF icon Cooljarloo Mine – Falcon Extension
Key Environmental Factors: 
Flora and Vegetation
Landforms
Hydrological Processes
Date published: 
Monday, 11 August, 2008
Appeals close: 
Monday, 25 August, 2008
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Attachment 1 - Minor changes to the clearing footprint, change typographical error of ore extracted from 3.1 million tonnes to 7.4 million tonnes - s45C change to proposal approved on 5 August 2009.

Date of approval: 
Monday, 16 March, 2009
Ministerial Statement: 
PDF icon Ministerial statement 790
Post-assessment changes
Section 46 inquiry: 
Cooljarloo Mine - Falcon Extension (s46)