Utah Point Berth Project (Stage B)

Project
Proponent: 
Port Hedland Port Authority
Proposal description: 

The Utah Point Berth Project consists of two separate stages:

  1. Stage A: Dredging and Reclamation; and
  2. Stage B: Construction and Operation.

Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed.

The EPA determined that Stage B, the construction and ongoing operation of stockyard and ship-loading facilities required formal environmental impact assessment. This assessment report relates only to Stage B.

Assessment Number: 
1662
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Industrial
Infrastructure
Last updated: 
September 27, 2024
Current Status: 
Ministerial Statement withdrawn under s.47A
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon 1662-ChairDets-111206.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Monday, 11 December, 2006
3. Assessment
Scoping
Approved: 
Friday, 27 July, 2007
Environmental Review
Public submissions: 
Monday, 16 June, 2008 to Monday, 14 July, 2008
Environmental Review documentation: 
PDF icon PER document
PDF icon Appendix A - Scoping Report
PDF icon Appendix B - Community Consultation
PDF icon Appendix C - Concept Plans & Designs
PDF icon Appendix D - Geotechnical Report
PDF icon Appendix E - Biodiversity Assessment Report
PDF icon Appendix F - Mangroves Assessmen Report
PDF icon Appendix G - Traffic Assessment Report
PDF icon Appendix H - Preliminary Site Investigation Report
PDF icon Appendix I - Air Quality Report
PDF icon Appendix J - Noise Report
PDF icon Appendix K - Framework Environmental Management Plan
PDF icon Appendix L - Sea Turtle Assessment
PDF icon Appendix M - Groundwater Baseline and Management Report
PDF icon Appendix N - Background Water Quality Report
Proponent response to submissions: 
PDF icon Summary of submissions and proponent’s response to submissions
4. EPA Report on assessment
EPA Report Number: 
1311
EPA Report: 
PDF icon Utah Point Berth Project (Stage B)
Key Environmental Factors: 
Social Surroundings
Coastal Processes
Date published: 
Monday, 12 January, 2009
Appeals close: 
Tuesday, 27 January, 2009
5. Decision on proposal and implementation of proposal
Withdrawal of Ministerial Statement
Notice of withdrawal of Ministerial Statement: 
PDF icon Notice to Withdraw Statement - 270924.pdf
Date withdrawn: 
Friday, 27 September, 2024
Ministerial Statement
Comments: 

Attachment 1 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.

Date of approval: 
Wednesday, 4 March, 2009
Ministerial Statement: 
PDF icon Ministerial Statement 788
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 788 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.

Date of approval s. 45C: 
Monday, 14 December, 2015