EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Project
Proponent: 
Simcoa Operations Pty Ltd
Proposal description: 

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey.

This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the associated increase in production.

Assessment Number: 
1783
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Industrial
Last updated: 
August 9, 2021
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon Referral document
2. Decision on whether to assess this proposal
Chair's Determination: 
Assessment on referral information (ARI)
Extract of determination: 
PDF icon 1783-ChairDets-060409.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Date published: 
Monday, 6 April, 2009
4. EPA Report on assessment
EPA Report Number: 
1317
EPA Report: 
PDF icon Silicon Project, Kemerton and Mine at Moora – Addition of a Fourth Submerged Arc Furnace at the Kemerton Smelter
Key Environmental Factors: 
Flora and Vegetation
Date published: 
Monday, 6 April, 2009
Appeals close: 
Monday, 20 April, 2009
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 16 November, 2009
Ministerial Statement: 
PDF icon Statement 813.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 813 - Increase mine depth to mine below the water table; increase the groundwater requirements from 80,000 kilolitres per annum to 250,000 kilolitres per annum; include water discharge via Kiaka Creek to the Coonderoo River wetlands; and administrative changes to remove key characteristics which are not environmentally significant or regulated by other authorities - changes to proposal approved under s45C on 21 October 2016.

Attachment 2 to Statement 813 - Changes:
• Modification of Moora mine disturbance footprint and addition of a Development Envelope.
• Change to dewater discharge location.
• Increase in authorised extent of water consumption (groundwater) for Kemerton from 290,000 kL per annum to 312,000 kL per annum.
• Specify extent of native vegetation clearing within disturbance footprint.
• Replacement of Table 4, with a file reference number to identify the change in coordinates of the dewater discharge location.

Changes to proposal approved under s45C on 9 August 2021

Date of approval s. 45C: 
Friday, 21 October, 2016
Monday, 9 August, 2021

Source URL:https://www.epa.wa.gov.au/proposals/silicon-project-kemerton-and-mine-moora-revised-proposal