EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > North Star Magnetite Project Extension

North Star Magnetite Project Extension

Project
Proponent: 
FMG Iron Bridge (Aust) Pty Ltd
Proposal description: 

FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project, which is subject to Ministerial Statement 993 issued under Part IV of the Environmental Protection Act 1986. The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. 

The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an extension of the waste rock dump (334.5 ha); and ancillary infrastructure (91.7 ha).

Assessment Number: 
2353
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
April 26, 2024
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
North Star Magnetite Project Extension
Comment period: 
Friday, 12 August, 2022 to Thursday, 18 August, 2022
Referral documentation: 
PDF icon Referral Form
PDF icon Proposal Content Document - Significant Amendment - North Star Magnetite Project.pdf
PDF icon DWERDT637030 CMS18243 - Environmental Review Document ERD Rev 0 - July 2022 - North Star Extension Iron Ore Project - FMG Iron Bridge (Aust) Pty Ltd.pdf
PDF icon Appendix 01_Ministerial Statement 993.pdf
PDF icon Appendix 02_NSE Flora and Vegetation Survey.pdf
PDF icon Appendix 03_GlacierValley_VertebrateFauna_Spectrum Ecology.pdf
PDF icon Appendix 04_650GV-0000-RP-EN-0001 GlacierValley_SRE Invert Fauna.pdf
PDF icon Appendix 05_Northern Quoll Management Plan.pdf
PDF icon Appendix 06_P18150-REP-W-005_Rev1.pdf
PDF icon Appendix 07_P18150-REP-W-006_Rev1_rev.pdf
PDF icon Appendix 08_P21012 FMG Iron Bridge Aquatic Ecology Baseline Report v1.2.pdf
PDF icon Appendix 09_662MI-5700-PL-WM-0001_Revised Site 12 MP_Final_signedSM.pdf
PDF icon Appendix 11_Other Heritage Places -Search Results Report and Map.pdf
PDF icon Appendix 11_Registered Heritage Places - Search Results Report and Map.pdf
PDF icon Appendix 12_12536658_REP-0_IBO North Star Extension Air Quality Assessment.pdf
PDF icon Appendix 13_NSIO-SF-19001 Lvl1 EIA V0-2.pdf
PDF icon Appendix 14_100-PR-TA-0001 LUC Procedure.pdf
PDF icon Appendix 15_NS GHGMP.pdf
PDF icon Appendix 16 North Star Subterranean Fauna Desktop and Survey Draft Report July 2022.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon North Star Magnetite Project Extension (significant amendment to North Star Magnetite Project, Ministerial Statement 993)
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 19 December, 2022
3. Assessment
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon s. 43A Notice - 260424
Date of approval s. 43A: 
Fri, 26/04/2024

Source URL:https://www.epa.wa.gov.au/proposals/north-star-magnetite-project-extension