EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Sino Iron Mine Continuation

Sino Iron Mine Continuation

Project
Proponent: 
Sino Iron Pty Ltd and Korean Steel Pty Ltd
Proposal description: 

The Proposal is located in the Pilbara region of Western Australia.  CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa.

The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The period of discharge will increase from 13.7 hr/day to up to 24 hr/day.

Assessment Number: 
2329
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
March 21, 2022
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Sino Iron Mine Continuation
Comment period: 
Friday, 14 January, 2022 to Thursday, 20 January, 2022
Referral documentation: 
PDF icon Sino Iron Mine Continuation Project - Proposal Content Document.pdf
PDF icon CITIC Pacific Mining ARI ERD.pdf
PDF icon Appendix 1 - 20210324 Dewatering TO Consult 12GL.PDF
PDF icon Appendix 2 - PSM 2020 LoM Dewatering Prediction.pdf
PDF icon Appendix 3 - Dewatering Model Peer Review.pdf
PDF icon Appendix 4 - Citic_dewatering_Rev2_20211209.pdf
PDF icon Appendix 5 - RPS 2021 a MAW0762J.002_Fortescue River Discharge Background Variability Study_Rev 4.pdf
PDF icon Appendix 6 - Discharge Modelling Peer Review.pdf
PDF icon Appendix 7 - Protected matters - MNES search.pdf
PDF icon Appendix 8 - Fortescue River Estuary EQMP [DRAFT].pdf
PDF icon Appendix 9 - RPS 2021 b MAW0762J_004_Fortescue_Discharge_Cumulative_Impact_Modelling_Rev1.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Additional Assessment Information (public review)
Extract of determination: 
PDF icon Sino Iron Mine Continuation
Preliminary Environmental Factors: 
Benthic Communities and Habitats
Marine Environmental Quality
Marine Fauna
Flora and Vegetation
Inland Waters
Date published: 
Monday, 21 March, 2022

Source URL:https://www.epa.wa.gov.au/proposals/sino-iron-mine-continuation