EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Yardie Creek Road Realignment Project

Yardie Creek Road Realignment Project

Project
Proponent: 
Main Roads Western Australia
Proposal description: 

The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with environmental and heritage studies ongoing. The proposal area represents the development envelope within which the road will be constructed based on the current conceptual design.

The proposal area is approximately 41 hectares (ha) with a current design footprint of 12.30 ha. Based on the current design, up to 11.45 ha of native vegetation will be cleared. The proposal may have a direct impact on flora and vegetation, terrestrial fauna, subterranean fauna and social surroundings (Aboriginal, historical and natural heritage sites).

The EPA, in agreement with Commissioner of Main Roads, has terminated the assessment of the Yardie Creek Road Realignment project.

Assessment Number: 
2304
Region: 
Gascoyne
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
January 18, 2023
Current Status: 
Assessment has been terminated under s40A of the EP Act
1. Referral
Comment on this referral: 
Yardie Creek Road Realignment Project
Comment period: 
Monday, 19 July, 2021 to Sunday, 25 July, 2021
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Yardie Creek Realignment Biological Survey Final 2021.pdf
PDF icon Fig1-RegionalLocation.pdf
PDF icon Fig2-Development Envelope
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Yardie Creek Road Realignment Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Date published: 
Monday, 16 August, 2021
3. Assessment
Termination of assessment under s40A
Date of termination: 
Wednesday, 18 January, 2023
Termination notice: 
PDF icon Notice to terminate - Yardie Ck road realignment.pdf

Source URL:https://www.epa.wa.gov.au/proposals/yardie-creek-road-realignment-project