Mount Gibson Iron Ore Mine and Infrastructure Project

Project
Proponent: 
Extension Hill Pty Ltd
Notice of Change of Proponent: 
PDF icon Change of Proponent - 171024.pdf
Proposal description: 

Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export.

The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North are part of a ridge of Banded Ironstone Formations (BIFs) within the Mt Gibson ranges in the Mid West region of Western Australia.

Assessment Number: 
1538
Region: 
Mid West
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Iron Ore
Last updated: 
February 28, 2012
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Date published: 
Friday, 6 August, 2004
3. Assessment
Environmental Review
Public submissions: 
Monday, 17 April, 2006 to Tuesday, 30 May, 2006
4. EPA Report on assessment
EPA Report Number: 
1242
EPA Report: 
PDF icon Mt Gibson Iron Ore Mine and Infrastructure Project
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Date published: 
Monday, 27 November, 2006
Appeals close: 
Monday, 11 December, 2006
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Ministerial Statement 750 published on 24 September 2007; superseded by Ministerial Statement 753 published on 24 October 2007.

Date of approval: 
Wednesday, 24 October, 2007
Ministerial Statement: 
PDF icon Ministerial Statement 750
PDF icon Ministerial Statement 753.pdf
Post-assessment changes
Section 46 inquiry: 
Mt Gibson Iron Ore Mine and Infrastructure Project (s46)
s. 45C amendments: 

Attachment 1 - Changes to road and mine layout - s45C change to proposal approved on 20 February 2008.

Attachment 2 - Change to layout - s45C change to proposal approved on 26 August 2008.

Attachment 3 - Increase the mine pit, waste dump and processing plant area, and change the location of the accommodation village and airstrip - s45C change to proposal approved on 2 June 2009.

Attachment 4 - Correct two errors in the Key Characteristics Table - change to proposal approved under s45C on 31 March 2010.

Attachment 5 – Include two haul track access roads from the mine pit to the hematite ROM processing plant; expand an existing track to the waste dump area and the revision of the layout of the approved hematite explosives depot – change to proposal approved under s45C on 2 February 2011.

Attachment 6 – Mining rate, clearance increases, and power supply changes – change to proposal approved under section 45C on 28 August 2012.

Attachment 7 - Replace Figure 9 of Attachment 6 with a new Figure - change to proposal approved under s45C on 14 December 2016.


Source URL:https://www.epa.wa.gov.au/proposals/mount-gibson-iron-ore-mine-and-infrastructure-project