EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Albemarle Kemerton Plant (s46) [2230]

Albemarle Kemerton Plant (s46) [2230]

Project
Proponent: 
Albemarle Lithium Pty Ltd
Proposal description: 

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury.

The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product)  from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.

The construction of these trains will be staged over the next ten years with construction of the first trains planned to commence in 2018.  The plant will process spodumene ore concentrate supplied from the Talison mine in Greenbushes, the biggest source of spodumene ore concentrate in the southern hemisphere.

The requested s46 change relates to removing the offset requirements for the low lying Banksia attenuate woodlands or shrublands and reducing the offset requirements for foraging and potential breeding habitat for Carnaby's Cockatoo, Forest Red-tailed Black Cockatoo and Baudin's Black Cockatoo.

This proposal was assessed in conjunction with assessment 2296. EPA Report 1717 has been released for both assessments and is viewable here.

Assessment Number: 
2230
Region: 
South West
Referred under EP Act: 
s46
Industry sector: 
Industrial
Last updated: 
October 28, 2021
Current Status: 
EPA Report and Recommendations released - not appealable
EPA Report and Recommendations released - not appealable
2. Decision on whether to assess this proposal
Chair's Determination: 
s46 request for a change to environmental conditions (not subject to appeal): Public Notification
Extract of determination: 
PDF icon Albemarle Kemerton Plant (s46) [2232]
Preliminary Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Date published: 
Monday, 13 January, 2020
3. Assessment
Additional Assessment Information
Additional Assessment Information: 
PDF icon Greenhouse Gas Management Plan (Revision 3) - ALB Kemerton Plant .pdf
Date Published (Additional Assessment Information): 
October 28, 2021

Source URL:https://www.epa.wa.gov.au/proposals/albemarle-kemerton-plant-s46-2230