EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > West Pilbara Iron Ore Project Stage 2 - Hardey Proposal

West Pilbara Iron Ore Project Stage 2 - Hardey Proposal

Project
Proponent: 
API Management Pty Limited
Proposal description: 

The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure.

Assessment Number: 
1943
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Iron Ore
Last updated: 
November 12, 2018
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon Referral Document -West Pilbara Iron Ore Project Stage 2 – Hardey Proposa
PDF icon Appendix 2 WPIO Project Stage 2 Hardey Proposal Supporting Information
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Assessment on Proponent Information - Category A
Extract of determination: 
PDF icon Chairman's Determination - West Pilbara Iron Ore Project Stage 2 – Hardey Proposa
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 8 October, 2012
4. EPA Report on assessment
EPA Report Number: 
1474
EPA Report: 
PDF icon Report 1474 - West Pilbara Iron Ore Project Stage 2 - Hardey Proposal
Proponent documents: 
PDF icon Appendix 1 API Documents Ground water modelling
PDF icon Appendix 2 Noise Impact Assessment
PDF icon Appendix 3 Particulate Modelling Assesment
PDF icon Appendix 4 Soils and Landscape Assessment
PDF icon Appendix 5 Subterranean Fauna Assessment
PDF icon Appendix 6 Aquatic Ecosystem Surveys
PDF icon Appendix 7 Hardey Rail Corridor Fauna Survey
PDF icon Appendix 8 Vegetation and Flora Survey
PDF icon Appendix 9 Vegetation and Flora Survey
PDF icon Appendix 10 Hardey Proposal stage 2
PDF icon Appendix 11 Hardey Proposal stage 2 Supporting Information
PDF icon Appendix 12 Hardey Proposal stage 2 Supporting Information Development Envelopes
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 13 May, 2013
Appeals close: 
Monday, 27 May, 2013
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 21 August, 2013
Ministerial Statement: 
PDF icon Statement 944 - West Pilbara Iron Ore Project Stage 2 – Hardey Proposa
Post-assessment changes
Section 46 inquiry: 
West Pilbara Iron Ore Project Stage 2 - Hardey Proposal (s46) [2182]

Source URL:https://www.epa.wa.gov.au/proposals/west-pilbara-iron-ore-project-stage-2-hardey-proposal