Jimblebar Optimisation Project

Project
Proponent: 
BHP Billiton Iron Ore Pty Ltd
Proposal description: 

The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857.

The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman.

Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.

The Revised Proposal would require additional clearing of up to 2000 hectares of native vegetation and changes to the management of surplus water.

Groundwater will be abstracted for water supply and to dewater the orebodies. Surplus water management will include transfer to Ophthalmia Dam, controlled creek discharge and managed aquifer recharge

Assessment Number: 
2223
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
March 17, 2020
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Jimblebar Optimisation Project
Comment period: 
Thursday, 5 September, 2019 to Wednesday, 11 September, 2019
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Environmental Review Document.pdf
PDF icon Appendix 3 Caramulla MAR Injection Modelling Report.pdf
PDF icon Appendix 4 Caramulla Creek Discharge Modelling Report.pdf
PDF icon Appendix 6 Caramulla Creek Flora and Vegetation Survey.pdf
PDF icon Appendix 7 Vegetation Survey and Desktop Assessment Caramulla Creek.pdf
PDF icon Appendix 8 Reconnaissance Flora and Vegetation Survey Caramulla.pdf
PDF icon Appendix 9 Shearers West Detailed Flora and Vegetation Survey.pdf
PDF icon Appendix 11 Jimblebar East and Caramulla Fauna Survey.pdf
PDF icon Appendix 12 Shearers West Targeted Vertebrate Fauna and SRE Invertebrate Fauna Assessment.pdf
PDF icon Appendix 13 Caramulla Level 1 Vertebrate Fauna Assessment.pdf
PDF icon Appendix 14 Caramulla Subterranean Fauna supplementary information.pdf
PDF icon Appendix 15 Jimblebar Flora and Vegetation Management Plan DRAFT.pdf
PDF icon Appendix 16 Jimblebar Mine Closure Plan.pdf
PDF icon Appendix 17_Jimblebar Water Management Plan DRAFT.pdf
PDF icon Appendix 18 Offsets Template.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Referral Information
Extract of determination: 
PDF icon Jimblebar Optimisation Project
Preliminary Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Friday, 27 September, 2019
4. EPA Report on assessment
EPA Report Number: 
1663
EPA Report: 
PDF icon Jimblebar Optimisation Project - EPA Report 1663.pdf
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Monday, 6 January, 2020
Appeals close: 
Monday, 20 January, 2020
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 17 March, 2020
Ministerial Statement: 
PDF icon Ministerial Statement 1126