Learmonth Pipeline Fabrication Facility

Project
Proponent: 
Subsea 7 Contracting Pty Ltd
Proposal description: 

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite.

A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields.

The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed and launched from a Bundle launchway that crosses the beach and extends into the subtidal zone at Heron Point in the Exmouth Gulf. Once launched the Bundles will be towed along a pre-determined route between two tugs at a controlled depth to the Bundle Parking area within which tow reconfiguration will occur before continuing offshore. The Bundles will be towed at the surface through the Ningaloo Marine Park and Ningaloo World Heritage Area.

Bundle launch activities are expected to result in 2-days offshore activity per launch in the Heron Point and Exmouth Gulf area with a maximum of 3 launches per annum.

This proposal was previously referred to the EPA and the level of assessment set at PER (Assessment No 2136). Assessment 2136 Learmonth Bundle Site proposal was terminated to allow an expanded footprint to be assessed and this revised footprint has been included as part of this revised proposal.

The EPA, in agreement with Subsea 7 Contracting Pty Ltd, has terminated the assessment of the Learmonth Pipeline Fabrication Facility project.

Assessment Number: 
2208
Region: 
Gascoyne
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
June 29, 2020
Current Status: 
Response to submission published
Response to submission published
1. Referral
Comment on this referral: 
Learmonth Pipeline Fabrication Facility
Comment period: 
Monday, 20 May, 2019 to Sunday, 26 May, 2019
Referral documentation: 
PDF icon Referral form
PDF icon Attachment A
PDF icon Attachment B
PDF icon Figures 1 to 4
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Learmonth Pipeline Fabrication Facility
Preliminary Environmental Factors: 
Social Surroundings
Benthic Communities and Habitats
Coastal Processes
Marine Environmental Quality
Marine Fauna
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Inland Waters
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Final ESD Learmonth Pipeline Fabrication Facility - 5 July 19.pdf
Approved: 
Friday, 5 July, 2019
Environmental Review
Public submissions: 
Wednesday, 2 October, 2019 to Saturday, 30 November, 2019
Make a submission: 
Learmonth Pipeline Fabrication Facility - Public Environment Review Consultation
Environmental Review documentation: 
PDF icon Subsea 7_Learmonth Pipeline Fabrication Facility_Public Environmental Review_FINAL_Volume 1.pdf
PDF icon Subsea 7_Learmonth Pipeline Fabrication Facility_Public Environmental Review_FINAL_Volume 2.pdf
PDF icon Subsea 7_Learmonth Pipeline Fabrication Facility_Public Environmental Review_FINAL_Volume 3.pdf
PDF icon Subsea 7_Learmonth Pipeline Fabrication Facility_Public Environmental Review_FINAL_Volume 4.pdf
PDF icon Attachment 1 - Final Approved ESD-180418.pdf
PDF icon Attachment 2A(1) Site Selection Report.pdf
PDF icon Attachment 2A(2) Site Selection Peer Review Report.pdf
PDF icon Attachment 2B(1) Learmonth Habitat Surveys_Report Part 1.pdf
PDF icon Attachment 2B(2) Learmonth Habitat Surveys_Report Part 2.pdf
PDF icon Attachment 2B(3) Learmonth Habitat Surveys_Appendices.pdf
PDF icon Attachment 2C Learmonth and Exmouth Gulf Habitat Survey.pdf
PDF icon Attachment 2D Shoreline Movement Assessment.pdf
PDF icon Attachment 2E(1) Learmonth Coastal Processes Assessment.pdf
PDF icon Attachment 2E(2) Coastal Processes Peer Review Report.pdf
PDF icon Attachment 2F Learmonth Water and Sediment Quality Assessment.pdf
PDF icon Attachment 2G Hydrodynamic Survey Field Report.pdf
PDF icon Attachment 2H Learmonth Sediment Dispersion Modelling Report.pdf
PDF icon Attachment 2I(1) Subsea7 Learmonth Bundle IMS Risk Assessment.pdf
PDF icon Attachment 2I(2) Letter DPIRD to Subsea 7.pdf
PDF icon Attachment 2J Humpback Whale Aerial Survey Report.pdf
PDF icon Attachment 2K Learmonth migratory bird survey report.pdf
PDF icon Attachment 2L Learmonth Detailed Flora and Vegetation and Targeted Survey Report.pdf
PDF icon Attachment 2M Learmonth Subterranean fauna desktop assessment.pdf
PDF icon Attachment 2N Bundle Subterranean fauna review.pdf
PDF icon Attachment 2O Learmonth Pipeline Fabrication Facility Stygofauna Survey Report.pdf
PDF icon Attachment 2P Subsea 7 Level 1 Fauna Survey Report.pdf
PDF icon Attachment 2Q Learmonth SRE desktop review.pdf
PDF icon Attachment 2R Learmonth Surface and Groundwater Investigation Report - Part 1.pdf
PDF icon Attachment 2S(1) Learmonth Landscape and Visual Impact Assessment - Part 1.pdf
PDF icon Attachment 2S(1) Learmonth Landscape and Visual Impact Assessment - Part 2.pdf
PDF icon Attachment 2S(1) Learmonth Landscape and Visual Impact Assessment - Part 3.pdf
PDF icon Attachment 2S(2) Learmonth Landscape and Visual Impact Assessment Peer Review Report.pdf
PDF icon Attachment 2T Learmonth Social Impact Assessment.pdf
PDF icon Attachment 2U Subsea7 ASS Investigation Report.pdf
PDF icon Attachment 3A - Learmonth Marine Construction Monitoring and Management Plan.pdf
PDF icon Attachment 3B - Learmonth Marine Fauna Management Plan.pdf
PDF icon Attachment 3C - Learmonth Environmental Quality Plan.pdf
PDF icon Attachment 3D - Learmonth Marine Emergency Response Plan.pdf
PDF icon Attachment 3E - Learmonth Decommissioning and Closure Plan.pdf
PDF icon Attachment 3F - Learmonth Marine Operational Environmental Monitoring Plan.pdf
PDF icon Attachment 4 - Letters of support from Wick Community.pdf
PDF icon Attachment 5 - Subsea 7 HSEQ Policy Statement.pdf
Date Published (Environmental Review documentation): 
October 2, 2019
Proponent response to submissions: 
PDF icon Response to Submissions Report.pdf
PDF icon Attachment 1 - Table of Subsea 7 Responses to Public Submissions.pdf
PDF icon Attachment 1 - Table of Subsea 7 Responses to EPA Comments on EMPs.pdf
PDF icon Att2A - Learmonth Marine Construction Monitoring and Management Plan.pdf
PDF icon Att2B - Learmonth Marine Fauna Management Plan.pdf
PDF icon Att2C - Marine Emergency Response Plan.pdf
PDF icon Att2D - Learmonth Marine Operational Environmental Monitoring Plan_Final.pdf
PDF icon 3A Learmonth Benthic Habitat Survey Technical Note.pdf
PDF icon 3B Learmonth Underwater Noise Screening Assessment.pdf
PDF icon 3C Learmonth Noise Modelling Study Report.pdf
Date published (Proponent response to submissions): 
June 29, 2020
Termination of assessment under s40A
Date of termination: 
Monday, 25 January, 2021
Termination notice: 
PDF icon Learmonth Pipeline Fabrication Facility - Terminate the Assessment - Notice s40A.pdf

Source URL:https://www.epa.wa.gov.au/proposals/learmonth-pipeline-fabrication-facility