Mining Area C - Southern Flank

Project
Proponent: 
BHP Billiton Iron Ore Pty Ltd
Proposal description: 

The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table.

Assessment Number: 
2085
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
June 17, 2025
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Mining Area C Revised Proposal
Comment period: 
Wednesday, 8 June, 2016 to Tuesday, 14 June, 2016
Referral documentation: 
PDF icon Referral Form
PDF icon Signed Cover Letter
PDF icon Figure 1 - Priority Flora
PDF icon Figure 2 - Threatened Ecological Communities
PDF icon Figure 3 - Aboriginal Sites Register
Image icon Figure 4 - Proposed Mine Layout
PDF icon Figure 5 - Land Tenure
PDF icon Figure 6 - Regional Location Map
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon 2085-CD-040716.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 4 July, 2016
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Mining Area C - Southern Flank (Final)
Approved: 
Monday, 19 September, 2016
Environmental Review
Public submissions: 
Monday, 8 May, 2017 to Tuesday, 6 June, 2017
Make a submission: 
Public Environmental Review - Mining Area C – Southern Flank
Environmental Review documentation: 
PDF icon Environmental Review - main document
PDF icon Appendix 1 - Authority to Act on Behalf of Joint Ventures.pdf
PDF icon Appendix 2 - MAC EMP Rev 6_Final.pdf
PDF icon Appendix 3 - DRAFT Biodiversity Condition Environmental Management Plan.pdf
PDF icon Appendix 3 - EIA Checklist for marine and terrestrial-120516.pdf
PDF icon Appendix 3 Environmental Scoping Document and Reference within this Document.pdf
PDF icon Appendix 4 - Area C and Surrounds Flora and Vegetation Onshore 2011.pdf
PDF icon Appendix 4 - Area C and Surrounds Flora and Vegetation Onshore 2011-Appendices.pdf
PDF icon Appendix 4 - Flora and veg addendum.pdf
PDF icon Appendix 4 - Flora and Veg EIA Southern Flank.pdf
PDF icon Appendix 4 - Rev 6 EMP Flora and Vegetation EIA.pdf
PDF icon Appendix 4 - South Flank Flora and Vegetation Onshore 2012.pdf
PDF icon Appendix 4 - South Flank Flora and Vegetation Onshore 2012-Appendices.pdf
PDF icon Appendix 5 - Ghost Bat EIA.pdf
PDF icon Appendix 5 - Ghost Bat peer review.pdf
PDF icon Appendix 5 - Rev 6 EMP SRE Invertebrate Fauna EIA.pdf
PDF icon Appendix 5 - Rev 6 EMP Vertebrate Fauna EIA.pdf
PDF icon Appendix 5 - SRE Invertebrate EIA.pdf
PDF icon Appendix 5 - Vertebrate Fauna Desktop Assessment.pdf
PDF icon Appendix 6 - Rev 6 EMP Stygofauna EIA.pdf
PDF icon Appendix 6 - Rev 6 EMP Troglofauna EIA.pdf
PDF icon Appendix 6 - Southern Flank Troglofauna EIA.pdf
PDF icon Appendix 6 - Stygofauna EIA.pdf
PDF icon Appendix 6 - Troglofauna Addendum #2.pdf
PDF icon Appendix 6 - Troglofauna addendum 1.pdf
PDF icon Appendix 7 - Central Pilbara Water Resource Management Plan 2.0_Draft.pdf
PDF icon Appendix 7 - Coondewanna Flats EcoHydrology Review and Conceptual Model.pdf
PDF icon Appendix 7 - Hydrological Impact Assessment.pdf
PDF icon Appendix 7 - Rev 6 EMP Hydrological Impact and Management Summary.pdf
PDF icon Appendix 7 - Surface Water EIA.pdf
PDF icon Appendix 8 – Draft Cultural Heritage Management Plan is not available as it contains confidential cultural information
PDF icon Appendix 8 - Section 18 Minsterial Constent South Flank.pdf
PDF icon Appendix 9 - Air quality Modelling Summary.pdf
PDF icon Appendix 10 - Visual Impact Addendum.pdf
PDF icon Appendix 10 - Visual Impact Assessment.pdf
PDF icon Appendix 11 - Noise Enviornmental Impact Assessment.pdf
PDF icon Appendix 12 - BHP Billiton Iron Ore Rehabilitation Standard 0001074.pdf
PDF icon Appendix 12 - Mine Closure Plan Mining Area C (Updated).pdf
PDF icon Appendix 12 - Preliminary Southern Flank AMD Risk Assessment.pdf
PDF icon Appendix 12 - WAIO AMD Management Standard 0096370.pdf
PDF icon Appendix 13 - Offsets for Southern Flank.pdf
Proponent response to submissions: 
PDF icon Response to Submissions
PDF icon Attachment 1 - New and Updated Figures and Tables.pdf
PDF icon Attachment 2 - EPA correspondence regarding Juna Downs.pdf
PDF icon Attachment 3 - Onshore Environmental Additional Information
PDF icon Attachment 4 - Updated Draft Central Pilbara Water Resource Management Plan.pdf
PDF icon Attachment 5 - Draft Biodiversity Management Plan.pdf
PDF icon Attachment 6 - Short Range Endemic Supporting Information.pdf
PDF icon Attachment 7 - Updated Hydrological Impact Assessment.pdf
PDF icon Attachment 8 - Mine Closure Plan.pdf
PDF icon Attachment 9 - Spectrum Ecology and ENV Reports.pdf
PDF icon Attachment 10 - Ghost Bat Research Plan.pdf
PDF icon South Flank troglofauna additional habitat assessment.pdf
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon S43A Notice 061117
Date of approval s. 43A: 
Mon, 06/11/2017
4. EPA Report on assessment
EPA Report Number: 
1610
EPA Report: 
PDF icon EPA Report 1610 - Mining Area C - Southern Flank Project
Key Environmental Factors: 
Social Surroundings
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Date published: 
Friday, 8 December, 2017
Appeals close: 
Friday, 22 December, 2017
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 20 February, 2018
Ministerial Statement: 
PDF icon Ministerial Statement 1072.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1072 - Changes:

  • a new location for managed aquifer recharge in the South Flank Valley
  • discharge to a drainage line that leads to Pebble Mouse Creek.

Changes to proposal approved under section 45c on 15 January 2020.

Attachment 2 to Ministerial Statement 1072 - Ministerial Statement Figure 4 to be replaced with a figure identifying the correct area for “Area A” due to an administrative error. Figure updated that accurately reflects areas of ‘Good’ to ‘Excellent’ condition native vegetation to be offset.

Changes to proposal approved under s.45c on 17 June 2025.

Date of approval s. 45C: 
Wednesday, 15 January, 2020
Tuesday, 17 June, 2025

Source URL:https://www.epa.wa.gov.au/proposals/mining-area-c-southern-flank