Pilbara Transmission Project

Project
Proponent: 
Pilbara Energy Company Pty Ltd
Proposal description: 

Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia.

The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure.  The proposal is to be located within a 4780 hectare (ha) development envelope.

The proposal corridor follows the existing FMG rail alignment from Port Hedland and then divides into two to enable servicing of FMG’s Chichester and Solomon Mining hubs.  FMG Iron Bridge (Aust) Pty Ltd.’s approved North Star Mine (subject of Ministerial Statement 993) will connect the network via transmission infrastructure within the North Star Mine approved infrastructure corridor.

The proposal will utilise existing disturbance areas associated with FMG’s rail alignment where possible limiting clearing to up to 305 ha.

The development envelope intersects several Priority Ecological Communities or their administrative buffers.  The development envelope also intersects several reserves including reserves for the use and benefit of the Aboriginal inhabitants.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
March 5, 2019
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Pilbara Transmission Project
Comment period: 
Monday, 11 February, 2019 to Sunday, 17 February, 2019
Referral documentation: 
PDF icon Referral Form.pdf
PDF icon Overview.pdf
PDF icon Flora and Vegetation Desktop Assessment.pdf
PDF icon Terrestrial Fauna Desktop Assessment.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act – Dealt with Under Part V Division 2 (Clearing) (Not appealable)
Extract of determination: 
PDF icon Pilbara Transmission Project
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Date published: 
Tuesday, 5 March, 2019

Source URL:https://www.epa.wa.gov.au/proposals/pilbara-transmission-project