Cape Lambert Port A Marine Structures Refurbishment Project

Project
Proponent: 
Robe River Mining Co Pty. Limited
Proposal description: 

The Proposal is to undertake essential maintenance works on the Cape Lambert Port A (CLA) wharf facility and associated jetty. The Proposal consists of two components, the CLA Dolphin Life Extension Project and the CLA Jetty Strengthening Project, collectively referred to as CLA Marine Structures Refurbishment Project (the Proposal).

The CLA dolphins were constructed between 1972 and 2002, with recent inspections indicating that the current dolphins are near end of life and need replacement. In addition to this, the existing jetty is approximately 40 years old and reinforcement of the structure is required to ensure continued resilience to future adverse weather events (e.g. cyclones).

The Proposal will also include establishment of two laydown areas within already cleared areas, installation of 144 piles for replacement dolphin structures and jetty strengthening using a hydraulic pile hammer supported by a crane and jack-up barges, removal of redundant dolphin structures and installation of new walkways between dolphins to improve safety and access around the wharf.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
May 20, 2019
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
Cape Lambert Port A Marine Structures Refurbishment Project
Comment period: 
Wednesday, 9 January, 2019 to Tuesday, 15 January, 2019
Referral documentation: 
PDF icon Referral Form
PDF icon Environmental Review Document
PDF icon Attachment A - Pile Driving Noise Literature Review 2018 Addendum.pdf
PDF icon Attachment B - Acoustic Modelling of Impact Pile Driving.pdf
PDF icon Attachment C - Underwater Noise Impact Assessment.pdf
PDF icon Attachment D - Jetty Habitat.pdf
PDF icon Attachment E - Environmental Management Plan.pdf
PDF icon ERM Noise Impact Assessment.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)
Extract of determination: 
PDF icon Cape Lambert Port A Marine Structures Refurbishment Project
Public advice: 
PDF icon CMS17535 - Public Advice
Date published: 
Monday, 20 May, 2019

Source URL:https://www.epa.wa.gov.au/proposals/cape-lambert-port-marine-structures-refurbishment-project