EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Sandy Ridge Project

Sandy Ridge Project

Project
Proponent: 
Tellus Holdings Ltd
Proposal description: 

The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north west of Kalgoorlie.

Assessment Number: 
2057
Region: 
Goldfields Esperance
Referred under EP Act: 
s38
Industry sector: 
Sand, rock, gravel and clay
Waste management
Last updated: 
February 5, 2019
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Sandy Ridge Project
Comment period: 
Friday, 3 July, 2015 to Thursday, 9 July, 2015
Referral documentation: 
PDF icon Referral Form
PDF icon Supplementary Referral Report
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Sandy Ridge Project
Preliminary Environmental Factors: 
Human Health
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Monday, 17 August, 2015
3. Assessment
Scoping
Environmental scoping document for public comment: 
PDF icon Sandy Ridge Project DRAFT ESD
Public comment on Environmental Scoping Document: 
Thursday, 31 March, 2016 to Thursday, 14 April, 2016
Comment on this ESD: 
Sandy Ridge Project
Environmental scoping document: 
PDF icon Sandy Ridge Project FINAL ESD
Approved: 
Friday, 27 May, 2016
Bilateral assessment (EPBC Act): 
2015/7478
Environmental Review
Public submissions: 
Monday, 12 December, 2016 to Monday, 6 March, 2017
Make a submission: 
Public Environmental Review - Sandy Ridge Facility
Environmental Review documentation: 
PDF icon PER (Main Document)
PDF icon Appendix 1 Environmental Scoping Document and Compliance Checklist
PDF icon Appendix 2 Environmental Risk Assessment
PDF icon Appendix 3 Flora and Vegetation Surveys
PDF icon Appendix 4 Geological Evolution Report
PDF icon Appendix 5 Soils and Materials Characterisation
PDF icon Appendix 6 Baseline Radiation and Metals Report
PDF icon Appendix 7 Landform Evolution Modelling
PDF icon Appendix 8 Terrestrial Fauna Surveys
PDF icon Appendix 9 Checklist for Biodiversity
PDF icon Appendix 10 Hydrology Assessment
PDF icon Appendix 11 Hydrogeology Assessment
PDF icon Appendix 12 Infiltration and Seepage Modelling
PDF icon Appendix 13 Heritage Survey
PDF icon Appendix 14 Radiation Assessments
PDF icon Appendix 15 Outline Safety Case
PDF icon Appendix 16 Outline Operating Strategy
PDF icon Appendix 17 Environmental Management Policy
PDF icon Appendix 18 Waste Facility Decommissioning and Closure Plan
PDF icon Appendix 19 Mine Closure Plan
PDF icon Appendix 20 Drinking Water Quality Management Plan
PDF icon Appendix 21 International Peer Review of Engineering Design of Waste Cell
PDF icon Appendix 22 Emergency Response Flow Chart
PDF icon Appendix 23 Engineering Designs of Waste Cells
PDF icon Appendix 24 Waste Acceptance Criteria and Supporting Documents
Proponent response to submissions: 
PDF icon Response to submissions - 21 August 2017
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon Notice of Decision to Consent to a Change to Proposal During Assessment - Sandy Ridge Facility
PDF icon Statement of Reasons for s43A change
Date of approval s. 43A: 
Mon, 11/09/2017
4. EPA Report on assessment
EPA Report Number: 
1611
EPA Report: 
PDF icon EPA Report 1611 - Sandy Ridge Project
Key Environmental Factors: 
Human Health
Flora and Vegetation
Terrestrial Environmental Quality
Terrestrial Fauna
Inland Waters Environmental Quality
Date published: 
Friday, 8 December, 2017
Appeals close: 
Friday, 22 December, 2017
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 27 June, 2018
Ministerial Statement: 
PDF icon Ministerial Statement 1078
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1078 - Changes:

  • Amend the development envelope from 1004.2 hectares to 1061 hectares to allow for relocation of groundwater abstraction infrastructure
  • Installation of a 1.5 megawatt solar farm for power generation
  • Addition of two stormwater sumps on internal roads in the infrastructure area
  • Reduction in the width of internal roads to the Class II landfill and along the groundwater pipeline to Carina Iron Ore Mine
  • Addition of an access road adjacent to Mt Dimer Road
  • Addition of a flood levee
  • Change in orientation and size of accommodation camp

Change to proposal approved under S45c on 5 February 2019.

Date of approval s. 45C: 
Tuesday, 5 February, 2019

Source URL:https://www.epa.wa.gov.au/proposals/sandy-ridge-project