Learmonth Bundle Site

Project
Proponent: 
Subsea 7 Australia Contracting PTY LTD
Proposal description: 

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite.

A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields.

The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the bundles will be constructed and launched from a bundle launch way which crosses the beach and extends into the subtidal zone at Heron Point in the Exmouth Gulf.  Once launched the bundles will be towed offshore along a pre-determined route. 

Bundle launch activities are expected to result in 2-days offshore activity per launch in the Heron Point and Exmouth Gulf area with a maximum of 3 launches per annum.

The EPA, in agreement with Subsea 7 Contracting Pty Ltd, has terminated the assessment of the Learmonth Bundle Site project.

Assessment Number: 
2136
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
May 15, 2019
Current Status: 
Assessment has been terminated under s40A of the EP Act
1. Referral
Comment on this referral: 
Learmonth Bundle Site – s43A Change to Proposal
Comment period: 
Thursday, 28 February, 2019 to Friday, 15 March, 2019
Referral documentation: 
PDF icon Referral Form
PDF icon Supporting Document
PDF icon Appendix A - Learmonth Habitat Surveys Part 1
PDF icon Appendix A - Learmonth Habitat Surveys Part 2
PDF icon Appendix B - Shoreline Movement Assessment
PDF icon Appendix C - Baseline Water and Sediment Quality Assessment
PDF icon Appendix D - Detailed Flora and Vegetation Assessment
PDF icon Appendix E - Subterranean Fauna Detailed Desktop Risk and Impact Assessment
PDF icon Appendix F - Desktop Assessment of Subterranean Fauna
PDF icon Appendix G - Level 1 Fauna Survey
PDF icon Appendix H - Short Range Endemic Desktop Review
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Environmental Review
Extract of determination: 
PDF icon Learmonth Bundle Site
Preliminary Environmental Factors: 
Social Surroundings
Benthic Communities and Habitats
Coastal Processes
Marine Environmental Quality
Marine Fauna
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 20 November, 2017
3. Assessment
Scoping
Public comment on Environmental Scoping Document: 
Wednesday, 14 February, 2018 to Wednesday, 28 February, 2018
Comment on this ESD: 
Learmonth Bundle Site – Environmental Scoping Document
Environmental scoping document: 
PDF icon CMS17231-Final Approved ESD-180418.pdf
Approved: 
Wednesday, 18 April, 2018
Termination of assessment under s40A
Date of termination: 
Wednesday, 15 May, 2019
Termination notice: 
PDF icon Notice under s40A - Termination of Learmonth Bundle Site, Assess No 2136.pdf
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon Final Request Change to Proposal Learmonth Bundle Site Feb 2019.pdf
PDF icon Attachment 1 - Exmouth Gulf Benthic Communities and Habitat Survey Report.pdf
PDF icon Attachment 2 - Learmonth Pipeline Fabrication Facility Turbidity Trial Memorandum Report.pdf

Source URL:https://www.epa.wa.gov.au/proposals/learmonth-bundle-site