Wagerup Alumina Refinery - production to a maximum capacity of 4.7 million tonnes per annum and associated bauxite mining proposal (s46)

Project
Proponent: 
Alcoa of Australia Limited
Proposal description: 

The Wagerup Alumina Refinery revised proposal is to construct and operate the Wagerup Alumina Refinery to a maximum production capacity of 4.7 million tonnes per annum (Mtpa) and its associated bauxite mining.

The proponent for the proposal, Alcoa of Australia (Alcoa), requested an extension of the Time Limit of Authorisation for substantial commencement (now referred to as the Time Limit of Proposal Implementation) to be extended by five years to 14 September 2021 as the third production unit had not yet been constructed. In response, the Minister for Environment requested (17 February 2016) that the EPA inquire into and report on the matter of changing implementation conditions for the Wagerup Alumina Refinery (Ministerial Statement 728).

Region: 
Peel
Referred under EP Act: 
s46
Industry sector: 
Iron Ore
Last updated: 
December 18, 2017
Current Status: 
Ministerial Statement published
Ministerial Statement published
4. EPA Report on assessment
EPA Report Number: 
1604
EPA Report: 
PDF icon EPA Report 1604 - Wagerup Alumina Refinery (S46)
Key Environmental Factors: 
Social Surroundings
Date published: 
Monday, 2 October, 2017
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 18 December, 2017
Ministerial Statement: 
PDF icon Ministerial Statement 1069