Mineral sands dry processing plant, Muchea

Project
Proponent: 
TiO2 Corporation Ltd
Proposal description: 

In November 1987 the TiO2 Corporation submitted to the Environmental Protection Authority an ERMP describing a proposal which included the establishment of a mineral sands dry separation plant at a site just north of Muchea on the Brand Highway.

The EPA assessed that proposal subject to the implementation of several commitments and recommendations (EPA Bulletin 330, March 1988) and found it environmentally acceptable.

Subsequently the proponent submitted a proposal for the establishment of a synthetic rutile plant on the same site and was advised that the site was too close to Muchea for the synthetic rutile plant to be environmentally acceptable. This was due to potential impact from air emissions such as hydrogen sulphide. The proponent required both plants to be on the same location to enable ilmenite produced by the dry process plant to feed directly into the synthetic rutile plant, and wastes from the synthetic rutile plant to be backloaded to the minesite in trucks delivering concentrate to the dry process plant. Also a joint location offered economies in shared administration facilities and services.

Consequently the proponent located a potential alternative site and submitted separate proposals for a dry process plant and a synthetic rutile plant on that site.

This assessment is of the dry process plant (Assessment 191A). The assessment of the synthetic rutile plant (Assessment 191B) is reported in EPA Bulletin 377 (Ministerial Statement 67).

Assessment Number: 
191A
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Mineral sands
Last updated: 
May 3, 1989
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon Notice of Intent
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Date published: 
Sunday, 10 July, 1988
4. EPA Report on assessment
EPA Report Number: 
344
EPA Report: 
PDF icon Mineral Sands Dry Processing Plant, Muchea
Date published: 
Wednesday, 31 August, 1988
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Attachment 1 to Statement 50 - amends Condition 7 so that the first three words of that Condition, which previously read "Prior to construction" now read "Prior to commissioning" - change to conditions approved on 3 May 1989.

Date of approval: 
Monday, 12 December, 1988
Ministerial Statement: 
PDF icon Ministerial Statement 50

Source URL:https://www.epa.wa.gov.au/proposals/mineral-sands-dry-processing-plant-muchea