Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station

Project
Proponent: 
State Energy Commission of Western Australia
Proposal description: 

The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction.

Assessment Number: 
214
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
April 30, 1990
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Date published: 
Friday, 3 February, 1989
3. Assessment
Scoping
Approved: 
Sunday, 5 February, 1989
Environmental Review
Public submissions: 
Friday, 3 March, 1989 to Friday, 28 April, 1989
Environmental Review documentation: 
PDF icon PER document
PDF icon Appendices to the PER
4. EPA Report on assessment
EPA Report Number: 
420
EPA Report: 
PDF icon Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station
Date published: 
Monday, 18 December, 1989
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 30 April, 1990
Ministerial Statement: 
PDF icon Ministerial Statement 98

Source URL:https://www.epa.wa.gov.au/proposals/proposed-transmission-line-corridor-northern-terminal-substation-pinjar-gas-turbine-power