EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Simulated natural gas plant, Mandurah

Simulated natural gas plant, Mandurah

Project
Proponent: 
State Energy Commission of Western Australia
Proposal description: 

The proposal is to provide reticulated gas to the public in the Mandurah area using standard air/gas mixing and storage facilities at SECWA's site in Gordon Road, Mandurah.

The plant will provide an initial gas reticulation system to allow a customer base to be established. Further planning is to provide a connection to the Perth-Bunbury natural gas pipeline when the customer base is large enough to warrant the capital investment.

The plant is similar to one operating in Albany manufacturing tempered liquid petroleum gas (TLP) and a copy of another which has operated in Bunbury for many years. Liquid propane will be unloaded from LPG road tankers via unloading pump and underground transfer pipeworks to two 45,000 litre storage tanks. Road movements are projected to be a maximum of one tanker per month.

Propane will be drawn from storage and mixed with equal volumes of air and stored in two 14,000 litre buffer tanks. The simulated natural product (SNG) will be distributed as required by customers.

Assessment Number: 
441
Region: 
Peel
Referred under EP Act: 
s38
Industry sector: 
Oil and gas
Last updated: 
September 10, 1990
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Consultative Environmental Review
Date published: 
Friday, 1 June, 1990
4. EPA Report on assessment
EPA Report Number: 
441
EPA Report: 
PDF icon Simulated Natural Gas Plant, Mandurah
Date published: 
Friday, 20 July, 1990
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Monday, 10 September, 1990
Ministerial Statement: 
PDF icon Ministerial Statement 107

Source URL:https://www.epa.wa.gov.au/proposals/simulated-natural-gas-plant-mandurah-0