In 1991, the State Energy Commission of Western Australia presented the Environmental Protection Authority with a number of alternatives for supplying power to the proposed Beenup mineral sands mine. These alternatives included on-site generation by the mining company, alternative technologies such as solar and wind power and a number of transmission line options.